Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency or <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.2-2 The project could result in the 4.2-2 If the proposed project General Plan amendment were Prior to adoption of SJCCDD Prior to <br /> redirection of growth away from approved, the County should redesignate County lands County's General Plan adoption of <br /> urban and rural communities within the Tracy Planning Area. Those lands, which are 2010, monitoring General Plan <br /> identified in the County's General designated for development, should be redesignated to should occur. 2010 <br /> Plan. The project's estimated agricultural uses until such lands are found necessary to <br /> population represents 42.6 percent accommodate the projected County growth. Such <br /> of the growth projected for the redesignation would be especially necessary if the three new <br /> entire Tracy Planning Area communities within the Tracy Planning Area were approved. <br /> without the new communities of Significant acreages on the west, east, and south sides of the <br /> Tracy Hills and New Jerusalem City of Tracy are shown in the County General Plan 2010 as <br /> (Figure 4.2-3). Such redirection of areas for urban uses. Those areas, which are outside the <br /> growth could have significant fiscal City's existing Sphere of Influence, should be the first areas <br /> ramifications for existing urban to be redesignated to agricultural uses. <br /> and rural communities. <br /> 'SJCCDD:San Joaquin County Crnnmunity Development Department; SJCBD:San.loaquin County Building Division;S.ICDPW San Joaquin County Department of Public Works;USACE: U.S.Army Corps <br /> of Engineers; SJCFCti: San Joaquin County Flood Control Engineer. CSD:Community Services District(of project); RWQCB: Regional Water Quality Control Board;CDFG: California Department of Fish <br /> and Game;SJCEHD:San Joaquin County Environmental Ilealth Department;DIIS:C=alifornia Deparunent of I lealth Services;1AFCO:Local Agency Formation Commission. Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> GPA: General Plan Amendment stage: SP: Specific Plan stage: PC: Pre-construction stage: (includes Tentative Map aPPFwval OF and Final Map approvals and other discretionary application <br /> approval Construction stage (prior to building permit issuance); O: Operational stage. <br />