Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitorine <br /> 4.8-3(d) The Medium-Iligh Density Residential area proposed Review of design SJCCDD SP and C <br /> adjacent to the marina should have a height limit of 40 feet during SP and <br /> or less. verification during <br /> construction. <br /> 4.8-3(e) The high Density and Medium-high Density Residential Review of f4;;al GRA SJCCDD rand SP <br /> areas just west of the open space corridor on the north side FeclaeF;* and design and C <br /> of Byron Road should have a height limit of 40 feet or less. during SP. <br /> Verification during <br /> construction. <br /> 4.8-4 Project development could result 4.8-4(a) Any required road widening should include protection of Review of final GPA SJCCDD C*9A SP <br /> in the removal of mature trees mature trees. For example, when trees are located along the mquert and <br /> currently visible from public roads, west side (e.g.. Patterson Pass Road) or south side (e.g.. landscaping standards <br /> which frame views along these Grant Linc Road), the area used for road widening should of the SP. <br /> roads. be the east or north sides, respectively. <br /> 4.8-4(b) The Specific Plan should include mapping of all mature on- Review of ,4 SJCCDD SP and C <br /> site trees visible from existing and proposed roads. Foguiist and <br /> Provisions to protect existing mature trees, except those landscaping standards <br /> that may be unsafe due to age or overall conditions, of the SP. <br /> should be included in the Plan. <br /> 4.8-5 The project could generate. light 4.8-5 The Specific Plan should include specific descriptions of how Review of design SJCCDD SP and C <br /> and glare which would be visible light and glare from the project would be minimized. during SP and <br /> from major roads. residences Mechanisms such as screening of parking areas with verification of <br /> within the project, and residences evergreen trees, setbacks from residential neighborhoods compliance during <br /> outside the project. adjacent to commercial areas, and a design review process construction. <br /> should be included in the Specific Plan. The design review <br /> process should include review of lighting proposals and <br /> architectural materials. A design review committee made up <br /> of both architects and landscape architects should oversee <br /> the design review process. <br /> SJCCDD: San Joaquin County Community Development Department: SJCBD:San Joaquin County Building Division;S.ICDPW San Joaquin County Department of Public Works;USACE: U.S.Army Corps <br /> of Engineers; SJCFCE: San Joaquin County Flood Control Engineer; CSD:Community Services District(of project); RWQCB: Regional Water Quality Control Board;CDFG: California Department of Fish <br /> and Game:SJCEHD:San Joaquin County Environmental Health Department;DI IS:California Department of I leallh Services;1.4I-CO:Local Agency Formalion Commission. 'Inose responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> ' GPA: General Plan Amendment stage; SP: Specific Plan stage: PC: Pre-construction stage: (includes Tentative Map approvRi o and Final Map approvals and other discretionary application <br /> approvals)- r-: Construction stage (prior to building permit issuance); O: Operational stage. <br />