My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:21:37 PM
Creation date
6/2/2020 4:53:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231758
PE
2361 - UST FACILITY
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
3032 E WATERLOO RD STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dc (4 W61 <br /> SANI,JOAQUIN Environmental Health Department <br /> 3 C O U N T Y.Y____ <br /> - <br /> 6 ,1 <br /> UST SYSTEM RETROFIT OR REPAIR J P N1 3 M <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHDj <br /> 1 . Site map enclosed? YES [ ] NO [ ] 9 I n O � 1 �_ N � � lw . # <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all man if8a6yeA tratAit� <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the "Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component, describe <br /> how this will be done. ( If adding piping , UDC's , or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4=8 as necessary for a timely plan review) : <br /> Remove existing total containment, replace with new APT double wall pipe. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> APT Pipe XP-150"D <br /> Diversified insert PF-IA 4.5X2.0 <br /> APT Piping Fitting MS-XP-150-150 <br /> 5. Decontamination Procedures : <br /> a. Will piping be decontaminated prior to removal? YES [ I NO [ ] <br /> b . Identify contractor performing decontamination : <br /> Name Phone (� <br /> Address City Zip <br /> 3of6 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.