Laserfiche WebLink
(6) The results of such analyses. <br /> c. Samples and measurements taken for the purpose of monitoring <br /> shall be representative of the monitoring activity. The <br /> Permittee shall maintain consistent records of sampling and <br /> measurements, such that data from separate sampling and <br /> measuring events may be readily compared. All sampling and <br /> monitoring plans submitted to the Director shall demonstrate <br /> that the methods used to select and obtain samples and <br /> measurements will yield results that are representative of <br /> the monitored activity . The method used to obtain a <br /> representative sample of the material to be analyzed must be <br /> the appropriate methods from Appendix I of 40 CFR Part 261. <br /> Laboratory methods must be those specified in Test Methods <br /> for Evaluating Solid Waste• Physical/Chemical Methods, <br /> SW-846, November 1986, or any later edition which may be <br /> published from time to time. If no laboratory method exists <br /> in this reference for one or more parameters which the <br /> Permittee is required to measure pursuant to this Permit, <br /> the Permittee shall use an appropriate method specified by <br /> Standard Methods of Wastewater Analysis, 16th edition, 1985, <br /> or any later editions which may be published from time to <br /> time; or an equivalent method approved by the Director. <br /> [40 CFR 270.30(j ) (1) ] <br /> 10. Reporting Planned Changes and Anticipated Noncompliance <br /> a. The Permittee shall give notice to the Director as soon as <br /> possible of any planned physical alterations or additions to <br /> the permitted facility or activity. [40 CFR 270.30(l) (1) ] <br /> b. The Permittee shall give advance written notice to the <br /> Director of any planned changes in the permitted facility or <br /> activity which may result in noncompliance with Permit <br /> requirements. [40 CFR 270.30(1) (2)] <br /> 11. Certification of Construction or Modification <br /> Except as provided in 40 CFR 270.42, the Permittee may not store <br /> hazardous waste in a modified portion of Building 804A until the <br /> Permittee has submitted to the Director, by certified mail or <br /> hand delivery, a letter signed by the Permittee and a registered <br /> professional engineer stating that Building 804A has been <br /> modified in compliance with the Permit; and <br /> a. The Director has inspected the modified Building 804A and <br /> finds it is in compliance with the conditions of the Permit; <br /> or <br /> b. The Director has either waived the inspection or has not. <br /> within 15 days notified the Permittee of his intent to <br /> inspect. [40 CFR 270.30(1) (2) ] <br /> II.6 <br />