Laserfiche WebLink
Pep Boys#711 <br /> documentation of local agency approval to the applicable CUPA for review and possible <br /> acceptance In lieu of the assessment specified in subsection(k)of this section.If there is no <br /> CUPA,or the CUPA requests that the Department make a determination,the documentation <br /> shall be submitted to the Department. Not applicable---an exemption has not been granted by <br /> the CUPA. <br /> 0)(1)(1)tank system must have secondary containment capable of containing 100 percent of <br /> the contents of the tank and ancillary piping volume;and—this requirement is satisfied because <br /> the tank is double walled See tank specifications in Appendix B. <br /> (j)(2)if the tank system is exposed to precipitation,the secondary containment system must <br /> have sufficient capacity,in addition to that required in subsection 0)(1)of this section,to <br /> contain run-on and infiltration from a 25-year,24-hour rainfall event,, The tank It located in a <br /> building and are not exposed to precipitation,run-on or infiltration. <br /> (j)(3)tank system secondary containment shall be provided with a leak detection system that is <br /> designed and operated so that it will detect either the failure of the primary and secondary <br /> containment structure or any release of hazardous waste or accumulated liquid in the secondary <br /> containment system within 24 hours,or at the earliest practicable time if the existing detection <br /> technology or site conditions will not allow detection of a release within 24 hours. The tank is <br /> inspected by Pep Boys employees daily and an inspection log is kept <br /> (k)The tank system assessment shall include all of the following information:� <br /> (k)(1)tank configuration(i.e.,horizontal,vertical),material of construction,and gross capacity(in <br /> gallons);See tank configurations, materials of construction and capacities in Table L <br /> (k)(2)design standard(s),if available,according to which the tank and ancillary equipment were <br /> or will be constructed and all of the following information. <br /> (k)(2)(A)material of construction;the tank is made of steel.See Table L <br /> (k)(2)(B)material thickness and the method used to determine the thickness;thicknesses were <br /> measured with an ultrasonic gauge,see Table 11for measurements. <br /> (k)(2)(C)description of tank system piping(material,diameter);this certification is for the tank <br /> only. <br /> (k)(2)(D)description of any internal and external pumps;Not applicable—there are no pumps on <br /> or in the tank. <br /> 9 <br />