My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
720
>
2200 - Hazardous Waste Program
>
PR0514108
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 5:46:17 PM
Creation date
6/3/2020 9:21:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0514108
PE
2227
FACILITY_ID
FA0009957
FACILITY_NAME
Firestone Complete Auto Care #028746
STREET_NUMBER
720
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09402043
CURRENT_STATUS
01
SITE_LOCATION
720 E HAMMER LN STE 1
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0514108_720 E HAMMER_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />Table of Contents <br />1.0 Introduction........................................................................................................................1 <br />1.1 <br />Scope of Work.......................................................................................................1 <br />2.0 Above Ground Tank Assessment......................................................................................2 <br />2.1 <br />Tank Configuration, Material of Construction and Gross Capacity ........................2 <br />2.2 <br />Design Standards..................................................................................................2 <br />2.2.1 Material of Construction.............................................................................2 <br />2.2.2 Material Thickness and Method Used to Determine the Thickness ........... 2 <br />2.2.3 Description of Tank System Piping (material, diameter)............................2 <br />2.2.4 Description of Any Internal and External Pumps.......................................3 <br />2.2.5 Sketch or Drawing of Tank Including Dimensions.....................................3 <br />2.2.6 Foundation.................................................................................................3 <br />2.3 <br />Documented Age of the Tank System...................................................................3 <br />2.4 <br />Description and Evaluation of Any Leak Detection Equipment .............................3 <br />2.5 <br />Description and Evaluation of Any Corrosion Protection Equipment, Devices or <br />Material.................................................................................................................. 4 <br />2.6 <br />Description and Evaluation of any Spill Prevention or Overfill Equipment ............4 <br />2.7 <br />Description and Evaluation of Secondary Containment for the Tank System .......4 <br />2.8 <br />Hazardous Characteristics of the Waste(s) that have been or will be Handled..... 5 <br />2.9 <br />Initial Tank Installation Certification.......................................................................5 <br />2.9.1 Weld Cracks or Breaks..............................................................................5 <br />2.9.2 Scrapes of Protective Coatings.................................................................5 <br />2.9.3 Corrosion................................................................................................... 5 <br />2.9.4 Structural Damage or Inadequate Construction or Installation..................5 <br />2.10 <br />Tightness Testing..................................................................................................6 <br />2.11 <br />Estimated Remaining Service Life of the Tank System.........................................6 <br />3.0 Above Ground Storage Tank Assessment Certification.....................................................7 <br />Attachments <br />Attachment 1: AST and Ancillary Equipment Diagram <br />Attachment 2: Photographs <br />Attachment 3: AST Manufacture and Installation Documentation <br />
The URL can be used to link to this page
Your browser does not support the video tag.