My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1214
>
2200 - Hazardous Waste Program
>
PR0541715
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:44:59 AM
Creation date
6/3/2020 9:22:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541715
PE
2227
FACILITY_ID
FA0004061
FACILITY_NAME
MCCORMICK & BAXTER CREOSOTING
STREET_NUMBER
1214
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
14520001
CURRENT_STATUS
02
SITE_LOCATION
1214 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0541715_1214 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> V1. FINANCIAL RESPONSIBILITY <br /> I . Cost estimate for facility closure. <br /> (a) The owner or operator shall have a written estimate of the <br /> cost of closing the facility in accordance with the applicable <br /> closure requirements of this document. The owner or operator <br /> shall keep this estimate, and all subsequent estimates, at the <br /> facility. The estimate shall equal the cost of closure at the <br /> point in the facility's operating life when the extent and <br /> manner of its operation would make closure the most expensive, <br /> as indicated by its closure plan. <br /> (b) The owner or operator shall prepare a new closure cost estimate <br /> whenever a change in the closure plan affects the cost of <br /> closure. <br /> (c) On each anniversary of the effective date of this document, <br /> the owner or operator shall adjust the latest closure cost <br /> estimate using an inflation factor derived from the annual <br /> Implicit Price Deflator for Gross National- Product as published <br /> by the U.S. Department of Commerce in its Survey of Current <br /> Business. The inflation factor shall be calculated by dividing <br /> the latest published annual Deflator by the Deflator for the <br /> previous year. The result is the inflation factor. The adjusted <br /> closure cost estimate shall equal the latest closure cost esti- <br /> mate (see Item 1 (b)) times the inflation factor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.