My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1214
>
2200 - Hazardous Waste Program
>
PR0541715
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:44:59 AM
Creation date
6/3/2020 9:22:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541715
PE
2227
FACILITY_ID
FA0004061
FACILITY_NAME
MCCORMICK & BAXTER CREOSOTING
STREET_NUMBER
1214
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
14520001
CURRENT_STATUS
02
SITE_LOCATION
1214 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0541715_1214 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MCCORMICK & BAXTER CREOSOTING COMPANY <br /> STOCKTON$ ;SAN JOAQUIN COUNTY <br /> CORMICK & BAXTER ARE ENLARGING THEIR WOOD TREATING PROCESSES TO INCLUDE <br /> ADDITIONAL PENTACHLOROPHENOL TREATMENT FACILITIES. THIS PROCESS EMBODIES A PRESSURE <br /> CHAMBER WITH PROPANE GAS AS A" VEH I CLE TO CARRY THE f4 PtNTA" SOLUTION INTO THE'`WOOD <br /> FIBERS. I T IS ANTICIPATED THAT ALL EXCESS "PENIA" WILL BE DUMPED SACK TO THE SUPPLY <br /> TANK ALONG WITH THE PROPANE GAS BEFORE PRESSURE CHAMBER IS OPENED. <br /> PRESENT PROCESSES CONSIST OF BOTH CREOSOTE AND COPPER TREATMENT. VARIOUS <br /> MATERIALS ;ARE USED IN THESE PROCESSES INCLUDING PETROLEUM FRACTIONS2CREOSOTE, <br /> CHLORINATED PHENOLS AND A` CHROMATED ZINC ARSENATE SALT.. DRAINAGE FROM BOTH OF <br /> THESE PROCESSES DISCHARGE TO CITY OF STOCKTON SEWERS. PRESENT DISCHARGE CONSISTS` <br /> OF MINOR AMOUNT'S OF COOLING WATER AND BOILER SLOWDOWN. THIS DISCHARGE HAS BEEN <br /> COVERED UNDER THE ARD=S REQUIREMENTS RESOLUTION No. 57-67 FOR SEVERAL YEARS. <br /> IT IS PLANNED TO PUMP 150 GPM FROM MORMON SLOUGH4 SPRAY IT OVER THE PRESSURE <br /> CHAMBER$ AND THEN DISCHARGE IT BACK INTO MORMON SLOUGH. No CONTACT WITH THE aPENTO <br /> IS ANTICIPATED, <br />
The URL can be used to link to this page
Your browser does not support the video tag.