Laserfiche WebLink
0 <br /> CERS Consolidated Eiporguicy Response/Contingoncy Plan <br /> 19-T-ERNAE-FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): cit. <br /> S 1.VE"AL WARNINGS: 2.PUBLIC ADDRESS OR INTERCOM SYSTEM; Q 3,TELEPHONE; <br /> El 4.PAGERS; 5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF- ITE RELEASE WILL OCCUR BY(Check all that apply): C12. <br /> 1.VERBAL WARNINGS; El 2.PUBLIC ADDRESS OR INTERCOM SYSTEM. 213.TELEPHONE; <br /> 4.PAGERS, 17 5.ALARM SYSTEM; 6,PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: CO. <br /> PRIMARY EMERGENCY COORDINATOR NAME: PHONE NO-: PHONE NO.: <br /> ALTERNATE EMERGENCY COORDINATOR NAME; PHONE NO.; PHONE NO.: <br /> C]Check-if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order afresponsibility, <br /> D. ]EA"RGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> -Check the app]icable boxes to indicate Your facility's Procedures for containing spills and preverting and mitinting releases,fres and/or exotosions. <br /> M7 <br /> 01. MONITOR FOR LEAKS,RUPTURES,PRESSURE 131ALD-U-P.ETC.: <br /> [J2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e g.,Portable spill containment waits,built-in berms),- <br /> C3 3. PROVIDE ABSORBENT PHYS(CAL BARRIERS(e.g.,Pads.spill pigs,spill pillows); <br /> 04. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> f-1 S. LINED TRENCH DRAINS AND/OR SUMPS; <br /> [3 6. AUTOMATIC PIPE SUPPRESSION SYSTEM; <br /> (M 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> M S. STOP PROCESSES AND/OR OPERATIONS; <br /> [j 9- AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM. <br /> n- 10.SHUT OFF WATER.GAS.ELECTRICAL UTILITIES, <br /> ral 11,CALL 9.1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE ANDIOR MEDICAL AID; <br /> [3 12.NOTIFY AND EVACUATE PERSONS IN ALL THIkEATENED AND/OR IMPACTED AREAS; <br /> f-I 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATIM <br /> R]14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> 0 15.REMOVE CONTArNEIIS AND/OR ISOLATE AREAS: <br /> rl 16,HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> (9 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> C3 18.VACUUM SUCTION USING APPROPRIATE VACUUM(ej.,Intrinsically safe)FOR SPILL CONTROL AND/Olk,CLEANUfl, <br /> F1 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> 0 20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> 21.OTHER(Specify): <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNALS)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply); <br /> ❑I. BELLS. Ez. <br /> 2' HORNS/SIRENS; <br /> • 3. VERBAL(i.e.Shouting); <br /> (3 4. OTHER(Spec6): <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street corner): F-3. <br /> Front Parking Lot,in between office and workshop <br /> Note:The Eme!p&cy Coordinator must account for all onsite amplo ees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br /> CI 1.WPJTTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> rl 2,EVACUATION MAP(S)DEPICTING ROUTES,EXrrS,AND ASSEMBLY AREAS-, <br /> 0 3. OTHER(Specify): <br /> Note:Evacuation procedardS and/or jnaps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS 17011 LOCAL EMERGENCY SERVICES(Check one of the following <br /> D 1. HAVE BEEN DETERMINED NOT NECESSARY; <br /> 0 2, THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> PAV.03107/17 Page 2 of 4 <br />