My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
818
>
2200 - Hazardous Waste Program
>
PR0501313
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 1:35:15 PM
Creation date
6/3/2020 9:23:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0501313
PE
2247
FACILITY_ID
FA0005063
FACILITY_NAME
DELTA PLATING INC
STREET_NUMBER
818
Direction
S
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729412
CURRENT_STATUS
02
SITE_LOCATION
818 S STANISLAUS ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2247_PR0501313_818 S STANISLAUS_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSURE SCHEDULE <br /> Delta Plating, Inc. has no intention of closing any of the fixed treatment units that <br /> it owns/operates in the foreseeable future. However, in the event of a closure of <br /> a fixed treatment unit: <br /> 1. All hazardous waste will be treated or removed from the facility and <br /> disposed of as hazardous waste within ninety (90) days after treating the <br /> final volume of hazardous waste. <br /> 2. All closure activities in accordance with the closure plan will be completed <br /> within the next ninety (90) days or 180 days after treating the final volume <br /> of hazardous waste. <br /> 3. Delta Plating, Inc. must perform and complete the closure activities within <br /> the above time periods unless we, the owner/operator, demonstrate to the <br /> Department that the activities required to complete the closure will require <br /> longer than the above time periods or the FTU has the capacity to treat <br /> additional wastes. <br /> TIME TABLE <br /> Step 1 Final volume of waste is treated currently not anticipated <br /> Step 2 All hazardous waste is treated/removed 90 days later than the date <br /> in Step 1 <br /> Step 3 Completion of all closure activities 180 days later than the date <br /> in Step 1 or <br /> 90 days later than the date <br /> in Ste e 2 <br /> Step 4 Final Closure Date Date in Step 3 <br /> Delta Plating, Inc. 818 S. Stanislaus St. Page 1.5 <br /> Stockton, CA 95206 <br />
The URL can be used to link to this page
Your browser does not support the video tag.