My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
818
>
2200 - Hazardous Waste Program
>
PR0501313
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 1:35:15 PM
Creation date
6/3/2020 9:23:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0501313
PE
2247
FACILITY_ID
FA0005063
FACILITY_NAME
DELTA PLATING INC
STREET_NUMBER
818
Direction
S
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729412
CURRENT_STATUS
02
SITE_LOCATION
818 S STANISLAUS ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2247_PR0501313_818 S STANISLAUS_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY -19-2004 08:59 AM CDMO 562 96$48 P.14 <br />Chemical Data Management Systems <br />Tank Certification - Subject to 66265.191-192 <br />RCRA Tanks installed after January 12, 1988, Non RCRA July 1, 1992 <br />^'. Inc, <br />C�MU' N <br /># 08 Holding Tank #2 <br />ren4 Nam <br />Age of tank Installed in 1984. <br />Description and evaluation of leak detection <br />Visual observation, All sides of tank are observable, except bottom. <br />Description and evaluation of corrosion protection <br />Construction material is corrosion resistant and no corrosion was observed. <br />Description and evaluation of spill prevention <br />None. <br />Description and evaluation of secondary containment <br />Contained in waste water treatment containment area which is adequate in capacity. <br />Describe any weld cracks or breaks <br />None observed. <br />Describe any scrapes of protective coating <br />None observed. <br />Describe any corrosion <br />one obse <br />Describe any structural damage or inadequate construction or installation <br />such as cracks, punctures, or damaged fittings <br />one obs e . <br />Describe method and result of leak test <br />Visually observed tank to be leak free. <br />Estimated remaining service life of the tank system (15 years for polymer tanks) <br />Tank has life in <br />of 15 years. Tank was installed in 1984. Tank must be <br />Rrecertified annually. <br />s foun ation s owing cracks or structural instability. Does foundation appear <br />adequate to support tank? <br />No cracks observed. <br />0 08 Holding Tank #2 / Holding rank Berm Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.