Laserfiche WebLink
MAY -19-2004 09:20 AM CDMS 562 gee 0949 P.01 <br />0 0 <br />Chemical Data Management Systems <br />Tank Certification - Subject to 66265-191-192 <br />RCRA Tanks installed after January 12,1988, Non RCRA July 1,1992 <br />n , Inc. <br />Delta Platin, <br />COMMY <br />#18A Final Adjustment <br />Twk Nom <br />Age of tank installed in 1984. <br />Description and evaluation of leak detection <br />Visual observation. All sides of tank are observable. <br />Description and evaluation of sPill PrevenfiOn <br />&"a"4k,nio Fit, <br />Description and evaluation of secondary containment <br />Contained in waste water treatment containment area which is adequate in capacity. <br />Describe any weld cracks or breaks <br />None observed. <br />Describe any scrapes of protective coating <br />None observed. <br />Describe any corrosion <br />No corrosion damage was observed. <br />Describe any structural damage or inadequate construction or installation <br />such as cracks, punctures, or damaged fittings <br />Describe method and result of leak test <br />Visually observed tank to be leak free. <br />Estimated remaining service lifc of the tank system (15 years for polymer tanks) <br />Tank should last at least 5 years, with proper maintenance <br />Is foundation showing cracks or structural instability. Does foundation appear <br />adequate to support tank? <br />No cracks observed. <br />#I SA Final Adjustment / Main Treatment Berm Page 47 <br />