Laserfiche WebLink
MAY -19-2004 09:22 AM CDMID 562 90 848 P.06 <br />W <br />Chemical Data Management Systems <br />Tank Certification - Subject to 66265.191-192 <br />RCRA Tanks Installed after January 12, 1988, Non RC RA July 1, 1992 <br />Delta Plating, Inc. <br />Can*n" Nwe <br />0180 Final Adjustment <br />Tent NOW <br />Does Company certify that tank system was properly designed Yes [:]No <br />and installed and any necessary repairs were performed? <br />. ................. . . . Date ................ . ............ .......... <br />Company representative Sigmture ............ . ....... . ............ <br />Secondary containment 0 yes C] No Tank Capacity 209 gallons <br />Containment area name Main Treatment Berm <br />Design standard used to construct tank Industry Practice. <br />Hazardous characteristic of waste handled corrosive metal bearing aqueous waste. <br />Material of construction Polypropylene <br />Tank configuration 09 Vertical [] Horizontal Material Thickness <br />Method used to determine thickness Measuring tape <br />Description of piping Tank input is overflow frorn #18B tank. Tank output is to sewer. <br />(material, diameter), Material is compatible. <br />and compatibility <br />Description of pumps None. <br />(internal, external), <br />and comnatibilitv <br />31 <br />3 <br />A 8C final Adjustment / Main Treatment Berm Page 52 <br />