Laserfiche WebLink
MAY -19-2004 09:25 AM CDM 562 98 846 <br />Chemical Data Management Systems <br />Tank C 'fication - Subject to 66265.191-192 <br />RCRA Tanks installed after January 12,1988, Non RCRA July 1,1992 <br />Delta Plating, Inc. <br />compfY Name <br />#19 Copper Batch Treatment <br />'F.* N,W <br />Describe seismic constraints. Are constraints sufficient to prevent dislogement of tanks <br />in a seismic zone. <br />The tank was installed before 1988 and has no constraints. This tank may move <br />during a seismic event. <br />Qualified P • <br />thy R. Lundell, PE <br />Inspection date: 5/10/2004 Certification expires: 5/10/2004 <br />Certification <br />I certify under penalty of law that this document and all attachments were prepared <br />under my direction or supervision in accordance with a system designed to .assure <br />that qualified personnel properly gather and evaluate the information submitted. <br />Based on my inquiry of the person or persons who manage the system, or those <br />persons directly responsible for gathering the information, the information is to the <br />best of my knowledge and belief, true, accurate and complete. i am aware that <br />there are significant penalties for submitting false information, including the <br />possibility of fine and imprisonment for knowing violations. <br />Certification <br />no seismic constraint on this tank. It should be attached to its foundation. <br />P. 11 <br />#19 Copper Batch Treatrncnt / Copper Batch Tank Containment Page 57 <br />