My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
818
>
2200 - Hazardous Waste Program
>
PR0501313
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 1:35:15 PM
Creation date
6/3/2020 9:23:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0501313
PE
2247
FACILITY_ID
FA0005063
FACILITY_NAME
DELTA PLATING INC
STREET_NUMBER
818
Direction
S
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729412
CURRENT_STATUS
02
SITE_LOCATION
818 S STANISLAUS ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2247_PR0501313_818 S STANISLAUS_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY -19-2004 08:46 AM CDMS 562 988 0848 P.12 <br />9 9 <br />Chemical Data Management Systems <br />Containment Certification For Tanks- Subject to CCR 66265.193 <br />RC RA Tank Installed after January 12, 1988, Non RC RA July 1, 1992 <br />Delta NO Inc <br />4yM14 <br />N" <br />Copper Batch <br />a t %,Mch Tank Containment <br />comwilaw mar" <br />Is the containment designed, installed, and operated to prevent any Yes [:1 No <br />migration of wastes to the soil, ground water, or surface water at any time <br />during the use of the tank system: and <br />Is the containment system capable of detecting and collecting releases and CK Yes [I No <br />accumulated liquids until the collected material is removed? <br />What is underlayment material? <br />What is coating material? <br />M+ : •IM -■4 <br />t. MI R-0 n- E <br />Is 24 hour Toni <br />system in place? <br />EFUE- M <br />Not applicable. <br />Is foundation adequate? :9 Yes 0 No <br />1017MC-4 • <br />Containment designed or operated to drain and rcm6`ve-7iRM F X Yes F1 Mt <br />Are containers/tanks elevated or otherwise protected from liquids? 0 Yes D No <br />Js containment indoors or outdoors? 0 Indoors 0 Outdoors Is run-on prevented? 0 Yes ONO <br />Secondary Containment Device Liner [I Vault H Double Walled [] Berm, [] Other <br />If a liner, is it a) free of cracks or gaps and b) designed and installed to completely 0 Yes [I No <br />surround tank and to cover all surrounding earth likely to come into contact with the <br />waste if released from the tanks? <br />If a vault, is it a) constructed with chemical resistant water stops in place at all joints (if 0 Yes 0 No <br />any) b) provided with an impermeable interior coating or lining that is compatible with <br />the waste c) provided with a means to protect against the formation of and ignition of <br />vapors withint the vault if waste is being transferred stored or treated and d) provided <br />with an exterior moisture barrier or otherwise designed or operated to prevent migration <br />of moisture into the valut if the vault is subject to hydraulic pressure? <br />If a double -walled tank, is it a) designed as an integral structure so that innner tank 0 Yes (I No <br />releases are contained by the outer tank, b) protected from both corrosion of the primary <br />tank Interior and the external shell of the outer tank and c) provided with a built in 24 <br />hour monitoring system <br />Page I Copper Batch Tank Containment <br />
The URL can be used to link to this page
Your browser does not support the video tag.