Laserfiche WebLink
taken a wastewater sample&he would turn in all samples <br /> today for analysis. (LTB) <br /> 11/23/93 Started haz waste generator report. LTB <br /> 11/18/93 Performed Haz waste generator inspection with Elanor Ratliff. <br /> Wrote notice to abate for(1) illegal disposal of grinding& sanding <br /> waste to dumpster as solid waste. (2)Drag out waste is leaking out <br /> plating room door. Obtained split samples of grinding waste & <br /> glass beads. (LTB) <br /> 10/29/93 Phoned Doug baker& asked for total haz waste manifested offsite <br /> in 1992. As per Doug Baker Delta Plating manifested 15.6 ton of <br /> haz waste in 1992 Change generator status to 22.27 >5 LTB <br /> 08/03/31 Mailed ROV to Doug Baker- filed ROV copy and Inspection Report <br /> in the file. SD <br /> 02/19/93 Submitted Inspection Report&ROV's. TB <br /> 10/25/92 Re-inspection concerning 1991 tonnage produced,training program <br /> & safety program. DPI generated the following haz waste as filter <br /> cake: <br /> Feb 4 7.1 tons <br /> May 3 7.1 tons <br /> Aug 2 8.1 tons <br /> Oct 31 5.7 tons <br /> Total 28.0 Tons in 1991 generated by DPI change category to>25 <br /> < 50 tons 22.28. TB <br /> 10/21/91 Report writing- report incomplete DPI generated the following haz See <br /> waste as filter cake: Next <br /> Jan- Mar 1990 6.75 Tons 5 yds Page <br /> April—June 1990 4.4 Tons 3.25 yds <br /> July-Se t 1990 4.4 Tons 3.25 yds <br /> 10/21/91 Oct Nov 1990 9.4 7.5 yds <br /> continued 24.7 tons TR <br /> 10/10/91 Leticia Resch&Pam Violette performed a hazardous waste <br /> generator inspection. TR <br /> 09/19/91 Checked haz waste report & submitted to Kasey. TR <br /> 09/13/91 Completed haz waste generator report. TR <br /> 09/13/91 Phoned Mr. Doug Baker and spoke to him about training <br /> requirements for employees handling hazardous waste. 29 CFR <br /> 1910.120 &Title 8 OSHA. (TR) <br /> 09/10/91 Contacted Doug Baker by Phone to ask about separation of cyanide <br /> from acids at present. Mr. Baker stated that the cyanide was divided <br /> from the hydrochloric and nitric acids. He also told me (2)the haz <br /> waste drums were now covered& labeled with a MSDS sheet. <br /> (The MSDS sheet is a paper Mr. Baker created with sludge analysis <br /> and accumulation start date (3)Mr. Baker said he had also posted <br /> the emergency plan exits. (4) When asked to verify the date of the <br /> biennial report Mr. Baker stated that he had submitted one on <br /> 8/12/88 and another report on 9/5/91. TR <br /> 09/10/91 Contacted O.E.S. to see business plan. The business plan has a <br />