My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
818
>
2200 - Hazardous Waste Program
>
PR0501313
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 1:35:15 PM
Creation date
6/3/2020 9:23:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0501313
PE
2247
FACILITY_ID
FA0005063
FACILITY_NAME
DELTA PLATING INC
STREET_NUMBER
818
Direction
S
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729412
CURRENT_STATUS
02
SITE_LOCATION
818 S STANISLAUS ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2247_PR0501313_818 S STANISLAUS_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yes No Comment <br /> 90 ga <br /> y AgggNIatiM in Tanks (cont.) <br /> (Section 66262.34) <br /> If a double-walled tank, is the double-walled <br /> [66265.193(e) (3)-] <br /> (A) Designed as an integral structure so that <br /> any release from the inner tank is contained <br /> by the outer shell? <br /> (B) If metal, protected frcmt corrasion of the <br /> primary tank interior and the external surface <br /> of the outer shell? <br /> (C) Provided withbuilt-in, continuous lead <br /> detection system capable of detecting a release <br /> within 24 hrs or ASAP, unless otherwise <br /> approved by the Department? <br /> Is all ancillary equipment provided with full <br /> secondary.contait (e.g. , trench, jacketing, <br /> double-walled piping) except for the following? <br /> (66265.193(f)-] <br /> (1) Aboveground piping that is visually <br /> inspected daily. <br /> (2) Welded flanges, joints and <br /> connections that are visually <br /> inspected daily. <br /> (3) Sealless or magnetic coupling pumps <br /> and sealless valves that are visually <br /> inspected daily. <br /> (4) Pressurized aboveground piping <br /> systems with automatic shut-off devices <br /> that are visually inspected daily. <br /> Tank Repair, Containment, or Closure: <br /> If the generator did not satisfy the requirements <br /> of sub-sections 66265.196(f) (2-4) (see below) , <br /> was the tank closed in accordance with section <br /> 66265.197? [66265.196(f) (1) ] <br /> If the cause of the release was a spill that did <br /> not damage the integrity of the system, was the <br /> waste removed and necessary repairs made before <br /> returning to service? [66265.196(f) (2) ] <br /> If the cause of the release was a leak fram the <br /> primary tank system into the secondary tank <br /> system, was the system repaired before returning <br /> to service? [66265.196(f) (3) ] <br /> Revised 7/15/91 Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.