Laserfiche WebLink
3. a. Describe the method that wiil be utilized to purge and/or inert the tank(s): <br /> •/ �/�:.. t}. it i. �, i� � i <br /> J. Tank;'Pining Hauler: <br /> Name T % <br /> Address.— f'3 riry �l i� �� ij? Zio <br /> Phone No.( .�F; ��j 5 <br /> Hauler Registration Y (if hauled as hazardous) ,x <br /> Tank,Piping Disposal Site: rSC4uf���J <br /> Name <br /> Address �.s=, .K T% <br /> CIn• �/-�,;,;�it r? Zin <br /> i <br /> Phone No.l.. <br /> EPA. M#of transported to a permitted TSD faciiiivj _ Li/y <br /> 9. Describe. in detail. how the soil and/or water samples) beneath the tank and piping will be obtained: <br /> 10. Describe how the excavation will be backfilled with suitable material uoon removal: <br /> - - <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> 2- <br /> b) What wild be the final destination of the excavated stockpile? <br /> r <br /> c) Contaminated Soil Hazardous Waste Hauler. <br /> Named \ <br /> Hauler Registration 7 53 <br /> i I <br /> Address + � ,-z�t`� 1 N 't�I F City_' ►(` Zip <br /> Picone No. <br /> EH 23 046 (Revised 9/11/96) Page 5 <br />