My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2300 - Underground Storage Tank Program
>
PR0231737
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 5:33:55 PM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0231737
PE
2332
FACILITY_ID
FA0003922
FACILITY_NAME
CEMEX Construction Materials Pacific, LLC
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
Dr
City
Tracy
Zip
95377
APN
25313011
CURRENT_STATUS
04
SITE_LOCATION
30131 S MacArthur Dr
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231737_30131 S MACARTHUR_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> The tanks will be purged by placing Ury ice inside ot the tanks. <br /> b. Tank/Piping Hauler. <br /> Name H & H Shipping <br /> Address 220 China Basin City San Francisco Zip 94107 <br /> Phone No.( 415 ) 543-4835 <br /> Hauler Registration# (if hauled as hazardous) GFQ36-017353 <br /> C. Tank/Piping Disposal Site: <br /> Name H & H Shipping <br /> Address 220 China Basin City San Francisco Zip 94107 <br /> Phone No.( 415 ) 543-4835 <br /> EPA ID (if transported to a permitted TSD facility) CAD 004771168 <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> The soil underneath the tanks will be obtained by scooping the soil up <br /> with the bucket of the excavator, then by forcing the soil through a brass <br /> tube and capping the ends <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> The excavation will be backfilled in a standard manner by pushing/placing <br /> clean fill into the tank pit and compacting as necessary. <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> Plastic <br /> b) What will be the final destination of the excavated stockpile? <br /> n/a <br /> c) Contaminated Soil Hazardous Waste Hauler: <br /> Name Hauler Registration # <br /> Address CityZip <br /> Phone No. ( ) <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.