My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2300 - Underground Storage Tank Program
>
PR0231737
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 5:33:55 PM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0231737
PE
2332
FACILITY_ID
FA0003922
FACILITY_NAME
CEMEX Construction Materials Pacific, LLC
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
Dr
City
Tracy
Zip
95377
APN
25313011
CURRENT_STATUS
04
SITE_LOCATION
30131 S MacArthur Dr
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231737_30131 S MACARTHUR_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exposure To Gold stress: work schedu will be adjusted to . <br /> provide sufficient rewimperiods in a heated area 10 warming up during <br /> opebation conducted i ld weather. Also thermal protective clothing such <br /> as wind and/or moisture resistant outer wear is recommended to be worn. <br /> Dehydration, or the lose of body fluids, occurs in a cold environmental and <br /> may increase the susceptibility of the worker to cold injury due to a <br /> ;significant change in blood flow to the extremities. Warm sweet drinks and <br /> sous should be provided at the work sit to provide caloric intake and <br /> flud volume. The intake of coffee should be limited (Adopted from TLV's <br /> and Biological Exposures Indices 11988-1989; AC01H) <br /> Y. XMICAL BURV XUANCE <br /> CONTRACTOR and subcontractors engaged in project activities must be <br /> participants in a medical surveillance program and must be cleared by the <br /> examining physician(s) to wear respiratory protection devices and <br /> protective clothing for working with hazardous materials. The applicable <br /> requirement under 29 CFR 1910. 120 of the Federal Administrative Code will <br /> also be observed. <br /> Z. DAYETY MM OR1NNTATXON IMEWIXG <br /> Field personnel from the CONTRACTOR and its subcontractors will <br /> attend a project-specific orientation meeting for safety issues and review <br /> the project tasks before beginning work. The meeting will be led by the <br /> CONTRACTOR's site foreman. In addition, fit-testing of respiratory <br /> protective devices will be conducted as part of the safety orientation <br /> meeting when the use of a respirator may be required. <br /> II. WORK SONXS AND 5SCURITY KRMURNS <br /> The area where active excavation work is being performed will be <br /> designated as an Exclusion Zone. only essential personnel will be allowed <br /> into an Exclusion Zone. When it is practical and local topography allows, <br /> approximately 20 to 75 feet of space surrounding the Exclusion Zone will be <br /> designated as a Contamination Reduction Zone. <br /> XXX16 IC CONTROL <br /> The CONTRACTOR is responsible for providing necessary traffic <br /> controls if required. Cones, wooden barricades, or a suitable alternative <br /> will be used to deny the public access to the Contamination Reduction Zone. <br /> If for any reason the safety of a member of the .public (e.g. , motorist or <br /> pedestrian) may be endangered, work will cease until the situation is <br /> remedied. Cones and warning signs will be used when necessary to redirect <br /> motorists or pedestrians. <br /> PROJECT PERSOUNRL <br /> Pacific Excavators will oversee and act accordingly during all phases <br /> of the project. The following management structure will be instituted for <br />
The URL can be used to link to this page
Your browser does not support the video tag.