Laserfiche WebLink
Exposure To Cold stress: Worx schedules will be adjusted to <br /> provide sufficient restrinds in a heated area fo arming up during <br /> operation conducted in cod weather. Also thermal Aptective clothing such <br /> ;as wind and/or moisture resistant outer wear is recommended to be worn. <br /> 'Dehydration, or the loss of body fluids, occurs in a cold environmental and <br /> may ihcrease the susceptibility of the worker to cold injury due to a <br /> significant change in blood flow to the extremities. Warm sweet drinks and <br /> soups should be provided at the work sit to provide caloric intake and <br /> fluid volume. The intake of coffee should be limited (Adopted from TLV's <br /> and Biological Exposures Indices 11988-1989; ACGIH) <br /> Y. MEDIOAL BORVEILLANCE <br /> CONTRACTOR and subcontractors engaged in project activities must be <br /> participants in a medical surveillance program and must be cleared by the <br /> examining physician(s) to wear respiratory protection devices and <br /> protective clothing for working with hazardous materials. The applicable <br /> requirement under 29 CFR 1910. 120 of the Federal Administrative Code will <br /> also be observed. <br /> SI. SAFETY Alm ORIENTATION XNEVIXG <br /> Field personnel from the CONTRACTOR and its subcontractors will <br /> attend a project-specific orientation meeting for safety issues and review <br /> the project tasks before beginning work. The meeting will be led by tho <br /> CONTRACTOR°s site foreman. In addition, fit-testing of respiratory <br /> protective devices will be conducted as part of the safety orientation <br /> meeting when the use of a respirator may be required. <br /> II. WORK SONXS AM BECURITY MWASURES <br /> The area where active excavation work is being performed will be <br /> designated as an Exclusion Zone. Only essential personnel will be allowed <br /> into an Exclusion Zone. When it is practical and local topography allows, <br /> approximately 20 to 75 feet of space surrounding the Exclusion Zone will be <br /> designated as a Contamination. Reduction Zone. <br /> RIII.TRAFFXC CONTROL <br /> The CONTRACTOR is responsible for providing necessary traffic <br /> controls if required. Cones, wooden barricades, or a suitable alternative <br /> will be used to deny the public access to the Contamination Reduction Zone. <br /> If for any r"son the safety of a member of the .public (e.g. , motorist or <br /> pedestrian) may be endangered, work will cease until the situation is <br /> remedied. Cones and warning signs will be used when necessary to redirect <br /> motorists or pedestrians. <br /> PROJECT PER503ML <br /> Pacific Excavators will oversee and act accordingly during all phases <br /> of the project. The following management structure will be instituted for <br />