Laserfiche WebLink
8. a. Describe the method that will be utilize# to purge and/or inert the tank(s): <br /> t c V w <br /> b. Tank/Piping Hauler: <br /> Name <br /> Address >� 4 rt^ &A - City--C Zip <br /> Phone No.( S<C> ) <br /> Hauler Registration # (if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Name eG <br /> Address (� rA(y - City 12 Zip <br /> Phone No. <br /> EPA M# (if transported to a permitted TSD facility) C 0a i f4E ZK 51 <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> -I is <br /> ce . <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> r-0 <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> " .( ( 111 P&" <br /> b) What will be the final destination of the excavated stockpile/? <br /> J T C(P re, <br /> c) Contaminated Soil Hazardous Waste Hauler. <br /> Name Hauler Registration # ]� <br /> Address City Zip S3 <br /> Phone No. <br /> EH 23 046 (Revised 9/11/96) Page 5 <br />