My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2300 - Underground Storage Tank Program
>
PR0231821
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:04:56 AM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0231821
PE
2332
FACILITY_ID
FA0004001
FACILITY_NAME
NAVAL COMMUNICATION STA*
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16203007
CURRENT_STATUS
04
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231821_305 W FYFFE_FILE 2.tif
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br />SUMMARY OF FIELD SAMPLING AND ANALYSIS PROGRAM <br />(Page 1 of 2) <br />Tank, Piping, and Stockpile Soil Samples! <br />Equipment <br />Total <br />Test Sample <br />Holding <br />Real <br />Duplicate <br />Blank <br />Number of <br />Analyte Method Matrix Containers Preservative <br />Time <br />Samples <br />Samples3 <br />Samples <br />Samples° <br />TPH DHS LUFT Soil Brass Liner Cool to 4' C <br />14 days <br />12 <br />0 <br />0 <br />12 <br />• <br />(gasoline) Grab <br />BTEX EPA 8020 Soil Brass Liner Cool to 4' C <br />14 days <br />12 <br />0 <br />0 <br />12 <br />Grab <br />Tetraethyl DHS LUFT Soil Brass Liner Cool to 4' C <br />14 days <br />12 <br />0 <br />0 <br />12 <br />Lead Grab <br />Ethylene EPA 504 Soil Brass Liner Cool to 4 ° C <br />14 days <br />12 <br />0 <br />0 <br />12 <br />Dibromide Grab <br />I Designates samples collected from tank and piping excavation and soil piles with brass tubes. <br />2 Holding times reflect days to perform extraction. <br />3 No duplicate samples or equipment blanks will be collected. <br />4 Total number of soil samples to be collected after removal of UST - 2 tank sidewall, 2 tank bottom, 2 <br />pipe trench, 2 pit <br />(estimated for after additional soil excavation), and <br />4 backfill material <br />g <br />
The URL can be used to link to this page
Your browser does not support the video tag.