Laserfiche WebLink
REPRODUCED AT GOVERNMENI EXPENSE, <br />I 1 40 <br />E <br />asphalt cement binder shall be between 5 and 7 percent. The mixing plant and <br />construction equipment shall conform to the requirements of Section 39 of the <br />Standard Specifications. <br />3.6.2 Placing: Deliver bituminous mixtures to the roadbed at temperatures <br />specified in Section 39 of the Standard Specifications. Spread in accordance <br />with Section 39 of the Standard Specifications. Cover all loads with <br />tarpaulin or other material during transportation. <br />3.6.3 Compaction: Initial or breakdown rolling and the final rolling of the <br />uppermost layer of the asphalt concrete shall be in accordance with Section <br />39 of the Standard Specifications. Compaction by vehicular traffic shall not <br />be permitted. <br />3.6.4 Joining Pavement: Carefully make joints between old and new pavements <br />or between successive days' work made in such manner as to ensure a <br />continuous bond between old and new sections of the course. Expose and clean <br />edges of existing pavement. Cut edge to straight, vertical surfaces. Paint <br />all joints with a uniform coat of tack coat before the fresh mixture is <br />placed. Prepare joints in the new pavement in accordance with Section 39 of <br />the Standard Specifications. <br />3.6.5 Protection of Pavement: After final rolling, no vehicular traffic of <br />any kind shall be permitted on the pavement until it has cooled and hardened <br />and in no case less than 6 hours. <br />3.7 MISCELLANEOUS AREAS: Surfacing of miscellaneous areas such as berms, <br />shoulders, curbs and gutters shall be as specified by the officer in Charge <br />of Construction and shall meet the requirements as specified in Section 39 <br />of the Standard Specifications, unless otherwise specified herein. <br />3.8 INSPECTION OF PLANT AND EQUIPMENT: The Contracting officer shall have <br />access at all times to all parts of the batch plant for checking the adequacy <br />of the equipment in use, inspecting the operation of the plant, verifying <br />weight, proportions and character of materials and checking temperatures <br />being maintained in the preparation of the mixture. <br />3.9 FIELD TESTS: <br />3.9.1 Sampling and Testing: Take samples and perform tests for the <br />determination of (a) in-place density of compacted base course (b) percent of <br />asphalt content, (c) thickness and (d) smoothness. Replace the pavement <br />where samples are removed. No payment will be made for the areas of pavement <br />deficient in composition, density or thickness until they are removed and <br />replaced. Determine maximum density in accordance with ASTM D 1557, Method <br />D. Perform in place density tests in accordance with ASTM D 1556. <br />3.9.1.1 Determine asphalt content in percent by extraction in accordance <br />with ASTM D 2172, Method A, and State Method Ca. 202. <br />