Laserfiche WebLink
R•1,PRODUCNT EXPENSEED AT GOVERNME <br />PART 3 - EXECUTION <br />3.1 FORMS: ACI 301. Set forms true to line and grade and make mortar - <br />tight. Chamfer above grade exposed joints, edges, and external corners Of <br />concrete 3/4 inch, unless otherwise indicated. Before concrete placement, <br />coat the contact surfaces of forms with a nonstaining form coating compound. <br />Do not use mineral oil on formed surfaces to be painted. Prevent concrete <br />damage during form removal. <br />3.2 PLACING REINFORCEMENT AND MISCELLANEOUS MATERIALS: ACI 301. Provide <br />bars, wire fabric, and other reinforcing materials, including wire ties, <br />supports, and other devices necessary to install and secure the <br />reinforcement. <br />3.2.1 Cover and Splicing: ACI 301, unless otherwise indicated. <br />3.2.2 Setting Miscellaneous Material: Place and secure anchors and bolts, <br />pipe sleeves, conduits and other such items in position before concrete <br />placement. Plumb anchor bolts and check location and elevation. Temporarily <br />fill voids in sleeves with readily removable material to prevent the entry of <br />concrete. <br />3.2.3 Construction Joints: ACI 301. Continue reinforcement across joints, <br />unless otherwise indicated. <br />3.2.4 Expansion Joints and Contraction Joints: ACI 301. For slabs on <br />grade, provide at edges of interior floor slabs, adjacent to walls, and as <br />indicated. Make expansion joints 0.5 inch wide, except as indicated <br />otherwise. Fill expansion joints not exposed to weather with preformed joint <br />material. Seal joints exposed to weather with joint sealant. Do not extend <br />reinforcement or other embedded metal items bonded to the concrete through <br />any expansion joint, unless an expansion sleeve is used. Provide contraction <br />joints, either formed or saw cut or cut with a jointing tool to the indicated <br />depth after the surface has been finished. Sawed joints shall be completed <br />within 4 to 12 hours after concrete placement. Protect joints from intrusion <br />of foreign matter. <br />3.3 MEASURING, MIXING, TRANSPORTING, AND PLACING CONCRETE: ACI 304, except <br />as modified herein. ASTM C 94; machine mix concrete and provide mandatory <br />batch ticket information for each load of ready mix concrete. Begin mixing <br />within 30 minutes after the cement has been added to the aggregates. <br />Additional water may be added, provided that both the specified maximum slump <br />and water -cement ratio are not exceeded. If the entrained air content falls <br />below the specified limit, add a sufficient quantity of admixture to bring <br />the entrained air content within the specified limits. Do not place concrete <br />when weather conditions prevent proper placement and consolidation; in <br />uncovered areas during periods of precipitation; or in standing water. Prior <br />to placing concrete, remove dirt, construction debris, and water. Consolidate <br />concrete slabs 4 inches or less in depth by tamping, spading, and settling <br />with a heavy leveling straight edge. <br />12-88-3458 <br />03302-5 <br />