My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2300 - Underground Storage Tank Program
>
PR0231737
>
COMPLIANCE INFO_1985-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2022 11:10:50 AM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1999
RECORD_ID
PR0231737
PE
2332
FACILITY_ID
FA0003922
FACILITY_NAME
CEMEX Construction Materials Pacific, LLC
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
Dr
City
Tracy
Zip
95377
APN
25313011
CURRENT_STATUS
04
SITE_LOCATION
30131 S MacArthur Dr
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231737_30131 S MACARTHUR_1985-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.O. Box 13059 <br /> Champion Sacramento, CA 95813-3059 <br /> Precision Tank Testing CA 800-660-9443 <br /> License No. 73848 NEV 800-949-9443 <br /> DATE: (916) 927-1557 <br /> OPERATOR: Fax: (916) 927-7345 <br /> LOCATION: SQLA-M-u <br /> PETRO-TITE PRECISION LIKE TEST: <br /> Wea QnL-t) PRESSURE VOLUME NET <br /> 15 MIN- READING BEFORE. AFTER BEFORE AFTER CHANGE <br /> TURBINE <br /> S U C T 10 MV-)Aru L4 <br /> PRODUCT4 01'Q <br /> VENT LINE i0 15 n5s -I <br /> VAPOR LINE () 15 �B�d .66C-Al <br /> BLEEDBACK Is 0 , Q LD 4-OOW <br /> LINE TEST M PASS FAIL— RESULTS—. QIQ <br /> BLEEDBACK TEST rk] PASS L FAIL, RESULTS+. QQ W <br /> PRESSURE VnT.TTMP NET <br /> 15 MIN READING BEFORE AFTER BEFORE AFTER CHANGE <br /> TURBINE <br /> SUCTION It, UVS 5V-1 <br /> PRODUCT LINE <br /> VENT LINE L I <br /> VAPOR LINE <br /> BLEEDBACK <br /> LINE TEST PASS _ FAIL RESULTS <br /> 9LEEDBACK TEST L I PASS FAIL RESULTS <br /> PRESSURE VOLUME NET <br /> 15 MIN. READING BEFORE AFTER BEFORE AFTER CHANGE <br /> TURBINE <br /> SUCTION <br /> PRODUCT LINE <br /> VENT LINE <br /> VAPOR LINE <br /> BLEEDBACK FAIL RESULTS <br /> LINE TEST A-1 PASS <br /> BLEEDBACK TEST L I PASS FAIL_ RESULTS <br /> PRESSURE VOLUME NET <br /> 15 MIN. RENDING BEFORE AFTER BEFORE AFTER CHANGE <br /> TURBINE <br /> SUCTION <br /> PRODUCT LINE <br /> VENT LINE f I <br /> VAPOR LINE <br /> BLEEDBACK <br /> LINE TEST PASS FAIL RESULTS <br /> BLEEDBACK TEST PASS FAIL RESULTS <br /> TECHNICIANNL�J� t' <br />
The URL can be used to link to this page
Your browser does not support the video tag.