My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2300 - Underground Storage Tank Program
>
PR0231737
>
COMPLIANCE INFO_1985-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2022 11:10:50 AM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1999
RECORD_ID
PR0231737
PE
2332
FACILITY_ID
FA0003922
FACILITY_NAME
CEMEX Construction Materials Pacific, LLC
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
Dr
City
Tracy
Zip
95377
APN
25313011
CURRENT_STATUS
04
SITE_LOCATION
30131 S MacArthur Dr
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231737_30131 S MACARTHUR_1985-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br /> WRr= G PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be Icpt at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Divisi=phone (209) 4.68_34.20 within 30 days of any changes to the monitoring <br /> procedures,— required to obtain approval before malang the change. <br /> Rued by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name RMC Lonestar Kerlinger Aggregate Plant <br /> Facility.Address 30350 S. Tracy Blvd. , Tracy, CA 95376 <br /> A. Describe the freq=xy of performing the monitoring: <br /> Tank Daily/Annually <br /> Piping Annually <br /> B. What methods and egiupment, identified by name and model, will be used for <br /> performing the moi * g. <br /> Tank Inventory reconciliation (calibrated wood rod)/tank testing <br /> (method approved by state) <br /> Piping_ Line tightness testing - methods approved by state <br /> C. Describe the locadca(s) where the monitoring will be performed (facility plot plan <br /> should be attached <br /> At all U.S.T's <br /> D. List the name(s) and-_te(s) of the people responsible for performing the monitoring <br /> and/or maintaining� equipment: <br /> Frank Wheeler - Master Mechanic <br /> Lloyd Burns - Plant Superintendent <br /> E. Reporting format fcr monitoring: <br /> Tank SJC Health Inventory Rec Forms <br /> Piping Tank Tester <br /> F. Describe the preve.-tee maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every Lmonths: Tank Tester <br /> G. Describe the training aecessary for the operation of UST system, including piping, <br /> and the monitoring t#pment: Yard man trained to take tank level <br /> readings and record results for office personnel to perform <br /> reconciliation calculations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.