Laserfiche WebLink
OACKFILL EXCAVATION CERTIFICATO <br />Project Location <br />Owner <br />Contractor'TL_e /CQ ti' - .,&2C. Phone No. �f/ )(ash;'—r3� /� License No. <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />tl�1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />V"'2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12' lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />✓B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br />backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (S) cubic yards per 1000 ,gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />* Shall be the responsible managing employee on the license or authorized agent. <br />