My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for total petroleum hydrocarbons as diesel (TPH-D) using EPA Method 8015M, for <br />Volatile Organic Compounds (VOCs) using EPA Method 8260, benzene, toluene, <br />ethylbenzene, xylene (BTEX) using EPA Method 8020. <br />• Installation of Aboveground Storage Tank (AST) — The Scope of Work to be <br />performed by Geofon also involves installation of one existing 2,000 -gallon AST on a <br />new reinforced concrete slab. Installation of AST includes, retrofitting the existing <br />AST to be compliant with local AST regulations, installation of safety valves, <br />installation and connecting new tank level and leak detection controls and new <br />underground electric and control wiring and conduit from the generator room to the <br />AST. <br />• Site Restoration — Geofon will remove all construction debris, materials and will <br />demobilize all equipment as soon as possible after site work has been completed. The <br />site will be restored to pre -construction conditions including proper backfilling, <br />compaction, grading, and any activities required to fully restore the site. <br />The USTs to be removed are 12,000 -gallon in capacity and the project site is located at <br />the northwest corner of Building 330, DDJC-Sharpe, Lathrop, California. The USTs rest on a 12 - <br />inch thick concrete tank hold-down slab. The USTs are made of fiberglass and were used to <br />store diesel fuel. The USTs system was used to supply diesel fuel to the generators. <br />4.1 PHYSICAL HAZARDS <br />Physical hazards are inherently present during field operations. Physical hazards present <br />at the project site include the mechanical hazards associated with the operation of vehicles and <br />equipment, slip -trip -fall hazards associated with operations conducted in a field environment, <br />musculo -skeletal injury hazards resulting from heavy work activities, hazards due to weather <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.