Laserfiche WebLink
4.20 PERSONAL PROTECTIVE , ► <br />MENT <br />The Site Safety and Health Officer (SSHO) in consultation with the CIH will be <br />responsible for determining required Personal Protective Equipment (PPE). A majority of the <br />work to be performed under this contract involves the potential for contact with petroleum <br />hydrocarbons. The potential for contact will be primarily through inhalation to the respiratory <br />system or through ingestion by hand mouth contact coupled with inadequate hygiene practices. <br />Coincidental contact with the whole body may also occur. <br />An assessment of the workplace has been performed by Geofon's CIH and the following <br />levels of personal protective equipment (PPE) will be used for this project. All work within the <br />exclusion zone will be conducted in Level C PPE. All work within the support zone will be <br />conducted in Level D PPE. The following table identifies the specific PPE required for each <br />equipment ensemble guidelines have been established for this project: <br />4.21 HEAT STRESS <br />• During the day-to-day fieldwork, the Project Manager, Site Task Manager, Site <br />Health and Safety Coordinator, and all workers will be alert for -the signs and <br />26 <br />