My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.20 PERSONAL PROTECTIVE , ► <br />MENT <br />The Site Safety and Health Officer (SSHO) in consultation with the CIH will be <br />responsible for determining required Personal Protective Equipment (PPE). A majority of the <br />work to be performed under this contract involves the potential for contact with petroleum <br />hydrocarbons. The potential for contact will be primarily through inhalation to the respiratory <br />system or through ingestion by hand mouth contact coupled with inadequate hygiene practices. <br />Coincidental contact with the whole body may also occur. <br />An assessment of the workplace has been performed by Geofon's CIH and the following <br />levels of personal protective equipment (PPE) will be used for this project. All work within the <br />exclusion zone will be conducted in Level C PPE. All work within the support zone will be <br />conducted in Level D PPE. The following table identifies the specific PPE required for each <br />equipment ensemble guidelines have been established for this project: <br />4.21 HEAT STRESS <br />• During the day-to-day fieldwork, the Project Manager, Site Task Manager, Site <br />Health and Safety Coordinator, and all workers will be alert for -the signs and <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.