Laserfiche WebLink
CONCRETE CURB <br />2,000 -GALLON _ <br />CONVALT AST <br />A.C. PARKING LOT NEW REINFORCED CONCRETE <br />NEW BOLLARDS,,,: — ,p CONTAINMENT SLAB <br />\` O O O O <br />(TYP.) <br />12,000 -GALLON L <br />(2 TOTAL) <br />CONCRETE SLAB <br />NEW UNDERGROUND <br />ELECTRICAL AND <br />FUEL LINES �,_ <br />CONCRETE CURB" <br />GRASS <br />s/ A.C. <br />CHILLER <br />i I <br />i I <br />1 i <br />I .I <br />1 i <br />w w <br />I I <br />CONTROLS <br />H DAY TANKS <br />w <br />z <br />O <br />U <br />N <br />SCALE: 1 INCH = 20 FEET <br />GENERATOR ROOM <br />BUILDING 330 <br />Figure 1 <br />UST REMOVAL & AST INSTALLATION <br />Sharpe Army Depot — Building 330 <br />Sharpe DDJC, CA <br />GEFOJ <br />INCORPORATE D <br />DRAWN: J. Gierek I DATE: 6/2/00 <br />FILE: Projects/05-5546 Sharpe Depot/Figurel .dwg U 5- 5 5 4 6 <br />NEW FOOT HIGH CHAIN <br />O <br />LINK FENCE AND GATE <br />F <br />WITH PLASTIC STRIP INSERTS <br />®,- <br />LAWN AREA <br />w <br />1 <br />� <br />w <br />CONCRETE SIDEWALK <br />i <br />s/ A.C. <br />CHILLER <br />i I <br />i I <br />1 i <br />I .I <br />1 i <br />w w <br />I I <br />CONTROLS <br />H DAY TANKS <br />w <br />z <br />O <br />U <br />N <br />SCALE: 1 INCH = 20 FEET <br />GENERATOR ROOM <br />BUILDING 330 <br />Figure 1 <br />UST REMOVAL & AST INSTALLATION <br />Sharpe Army Depot — Building 330 <br />Sharpe DDJC, CA <br />GEFOJ <br />INCORPORATE D <br />DRAWN: J. Gierek I DATE: 6/2/00 <br />FILE: Projects/05-5546 Sharpe Depot/Figurel .dwg U 5- 5 5 4 6 <br />