My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C7 <br />CONTRACTORS QUALITY C IRTROL REPORT (QCR' SUBMIT DAILY TO THE REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />399 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's, Install 1 AST 06 Jun 2001 <br />DDJC-Sharpe Site. CA CONTRACT NUMBER <br />DACWOS-00-D-0008 <br />CONTRACTOR (Or hired labor) t. WEATHER <br />Geo -Fon Inc - <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />PAGE 1 <br />No Interruption, No Precipitation <br />Temperature Min 7OF Max 9OF <br />Geofon crew arrived on 0600 hrs Concrete removal was completed. Allegre <br />Truck arrived at 0700 hrs. A total of 7 loads of concrete debris and AC debris <br />were loaded and off -hauled. Geofon crew began exposing the fuel lines and vent <br />lines. We ecountered a little difficulty removing the nuts and bolts from the <br />manhole covers. A compressor and spud breaker had to be rented. Don <br />Valentine arrived on site and delivered generator information for Mani Pests_ <br />Dan Beever also arrived on site to deliver generator information. Both the COR <br />and base representatives were made aware of the UST pull schedule. All of the <br />piping was triple rinsed into the USTs. No leakage occurred_ PID readings of <br />the excavated pea gravel were less than 3 ppm. The excavated pea gravel was <br />stockpiled on visqueen approximately 30 feet west of the excavation_ <br />Subject: Safety Inspections/Meetings: <br />All areas were inspected for safety issues. It was noticed that the heavy <br />equipment did not have fire extinguishers. The rental company was called, and <br />fire extinguishers were furnished within the hour. Safety issues including <br />safety around small machines were reviewed. Workers were reminded to wear <br />their safety glasses and ear plugs. Safety for other pedestrians was also <br />mentioned. Traffic control issues were reviewed. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Sub -Contractor <br />GEOFON INC. <br />GEOFON INC. <br />GEOFON INC. <br />9. EQUIPMENT HOURS <br />Labor <br />Classification <br />HEAVY -EQUIPMENT OPERATOR <br />LABORER, EXCAVATION (TERM) <br />SUPERV - EXCAVATING <br />The following Equipment was used for the specified time: <br />Number Of Hours <br />Employees Worked <br />1.0 10_0 <br />2.0 20.0 <br />1.0 10_0 <br />Total hours on job site this day......... 40.0 <br />Total hours from start of construction 370-0 <br />Hours On Hours In <br />ID Equipment Description Shift Standby Operation <br />:. 000005 Yellow Back hoe 1 0.0 10-0 <br />000006 Yellow Loader 1 0-0 to_0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.