Laserfiche WebLink
11/02/2001 10:47 9166811 GEOFON INC <br />g a. De CVbe the method thatwill. be ud&od to purge andlor inert the t1=4 <br />b. Tank0ping Hauler <br />Name <br />Address �4r1�C�sp <br />n <br />Phone No.{—I—. <br />Hauler Registration # (if hauled as hazardous) <br />PAGE 07 <br />e, TanWPLpingDisposal Site: Dit <br />Name ,tom i�° r� tt. S]Q /J 11 <br />Address /� :_ - City ' Zip .L _ <br />Phone N04 <br />EPA 1D# (if transported to a permitted TSD faeiiity)a�} d� �' <br />9. Is the sampling firm an Independent third party from the contractor? YES W NO[] <br />9a- Describe, in detail, how the soil andlor water sample(s) beneath the tack and piping will. be obtalned: <br />C+a VIFM I <br />r� i rte" 2� Poo Q • to �. 'ZD <br />Vrt <br />m c�•�,pr�a T <br />10, Describe bow the excavation will be baekfliied with snits le material upon removal: <br />de-41� lid <br />r�sliu Corn pfftc`r, Lk-, <br />11. Handling of excavated sol <br />a) What material will be used to be the tw* pit and cover the stockpile? <br />/A /Yir/ )a1fv,-1-17V 1feX)e- <br />b) What will be the final destination of the excavated stockpile? <br />� <br />C) Contaiulnated`Soil <br />,Hazardous Waste Hauler: <br />Name Hauler ReglatMItion0 <br />Address_ � RC1, L�Oy 6 Ckty�l�t�t �J Zip. <br />Phone No. { -� <br />EE 23 046 (Revised 08113199) Page 5 <br />