My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
11919
>
2300 - Underground Storage Tank Program
>
PR0232509
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2022 2:02:02 PM
Creation date
6/3/2020 9:43:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0232509
PE
2332
FACILITY_ID
FA0003731
FACILITY_NAME
PRECISSI FLYING SERVICE
STREET_NUMBER
11919
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05902047
CURRENT_STATUS
04
SITE_LOCATION
11919 N LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0232509_11919 N LOWER SACRAMENTO_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page__—of-- <br /> 5. SECONDARY PIPE TESTING <br /> 'rest Method Developed By: �+iping Manufacturer i--i industry Standard G Professional Engineer <br /> 0 Other (Speci1j) <br /> ,Test Method-(Fsed':— ,;,Zjlressure L Vacuum L!Hydrostatic <br /> 0 Other (Spect6q <br /> Equipment Resolution <br /> Test Equipment CLc�: <br /> F- <br /> Piping Run Piping Run # <br /> Piping Run# Piping Run# <br /> 7 X <br /> Piping Material: :T,);Zr— <br /> Ocr -� <br /> Piping Manufacturer: wa <br /> Piping.Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> ppiing <br /> -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start—T—inie-, -- <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RO: 157 <br /> Test Duration: <br /> Change in Reading(RI.-Ri): <br /> Pass/Fail Threshold or <br /> Criteria-suit. rdjP <br /> ass F] Fall F !!i <br /> L) Pass LI Fail <br /> Test <br /> 0 Pass E]Fail U Pass <br /> est Result: <br /> Comments— (include in urination on repairs made prior io testing, and reeommendedLo11ow-!pfor jbded tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.