Laserfiche WebLink
SWRCB,January 2002 Page__—of-- <br /> 5. SECONDARY PIPE TESTING <br /> 'rest Method Developed By: �+iping Manufacturer i--i industry Standard G Professional Engineer <br /> 0 Other (Speci1j) <br /> ,Test Method-(Fsed':— ,;,Zjlressure L Vacuum L!Hydrostatic <br /> 0 Other (Spect6q <br /> Equipment Resolution <br /> Test Equipment CLc�: <br /> F- <br /> Piping Run Piping Run # <br /> Piping Run# Piping Run# <br /> 7 X <br /> Piping Material: :T,);Zr— <br /> Ocr -� <br /> Piping Manufacturer: wa <br /> Piping.Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> ppiing <br /> -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start—T—inie-, -- <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RO: 157 <br /> Test Duration: <br /> Change in Reading(RI.-Ri): <br /> Pass/Fail Threshold or <br /> Criteria-suit. rdjP <br /> ass F] Fall F !!i <br /> L) Pass LI Fail <br /> Test <br /> 0 Pass E]Fail U Pass <br /> est Result: <br /> Comments— (include in urination on repairs made prior io testing, and reeommendedLo11ow-!pfor jbded tests) <br />