My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 1:52:51 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2006-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification For dendum for Vacuum/Pressure Interstitial sors <br />. . <br />I. Results of Vacuum/Pressure Monitoring Equipment Testing <br />This page should be used to document testing and servicing of vacuum and pressure interstitial sensors. A copy of <br />this form must be included with the Monitoring System Certification Form, which must be provided to the tank <br />system owner/operator. The owner/operator must submit a copy of the Monitoring System Certification Form to the <br />local agency regulating UST systems within 30 days of test date. <br />Manufacturer: veeder root <br />Model: TLS350 <br />System Type: ❑ Pressure; ® Vacuum <br />Sensor ID <br />S1 <br />Component(s) Monitored by this Sensor: 87 Product <br />Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: 87 Tank ANN <br />S2 <br />Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: 91 Product <br />S3 <br />Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: 91 Tank ANN <br />S4 <br />Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: DIE Product <br />S5 <br />Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; ❑Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br />How was interstitial communication verified? <br />❑ Leak Introduced at Far End of Interstitial Space;' ❑ Gauge; ❑ Visual Inspection; ❑ Other (Describe in Sec. J, below) <br />Was vacuum/pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (If no, describe in Sec. J, below) <br />J. Comments: 91 Product Float switch failed and 420 sensor on 87 ANN failed. *"repairs to be made by Central <br />Petroleum." <br />Page A5 of <br />' If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the <br />sensor, vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br />UN -036A - 1/1 www.unidoes.org Rev. 01/26/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.