Laserfiche WebLink
o?qufN c <br />?•' ��'''•�� SAN JOAQUIN COUNTY <br />y; Z� ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />4��POR� <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />Leak detector <br />❑ <br />Facility Address: <br />Service Request #: <br />Z5� <br />Onsite Service Technician's Na e: <br />ICC ServiceTechnician/installer Exp. Date: <br />Z'7 <br />Manufacturer TraiiingV l�1^s 5 <br />SERVICE <br />© i ��..r <br />Leak detector <br />❑ <br />mechanical Model: l 200o <br />❑ electronic Serial #:q(c -12-7 <br />El line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />Re <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LIS letter 150-1) <br />SERVICE <br />© i ��..r <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />TI ATA Y TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ Caldwell System ❑ Other <br />Re <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 20 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />/ t&5 <br />© i ��..r <br />I 4W <br />THIS FACILITY IS SUBJECT TO REI NSPE <br />TI ATA Y TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector <br />Re <br />Title - <br />W <br />EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br />Rev 11/17//08 <br />