My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 1:52:51 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2006-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAP M Address: Date: <br />CRA Field Leader Name and Signature: # of Site Workers: JSA Name- <br />Start Date: StartTime: End Date: End Time: Required PPE will be listed in the JSA. <br />Task Step Hazard Not Covered by JSA Steps Needed to Mitigate Hazard (Including PPE) <br />❑ Work >6 ft aboverade <br />g ❑Lock Oui/Tag Out of Energized Systems: ❑Confined Space Entry <br />❑ Trenching/Excavation >4 ft below grade ❑ Hot Work (Sawcutting within 35 ft of USTs, dispensers, or vent ❑ Cranes and/or Rigging <br />stack, Welding, Grinding, Cutting Metal) <br />A special permit to work will be required for any of these high-risk activities. The special permit to work will accompany this lob clearance form. <br />Sign 1n Glow Out <br />Site Representative: Signature: Site Representative: Signature <br />CRA Field Leader: Signature: CRA Field Leader Issuer: Signature: <br />] Have all site personnel been informed of work tasks and hazards? Has work area been cleaned and restored to original condition? <br />Has fuel delivery service been informed? ❑ Are there any conditions requiring notification of station personnel? <br />mill fuel be delivered during work hours? ❑ Have all unsafe conditions, near losses and incidents been reported? <br />1TPXre work areas cordoned off to protect workers, staff and the public? Other Comments: <br />❑ Are any high risk tasks planned that require a permit to work? <br />M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.