|
01/05/2007 16:10 9259790467 CFSI PAGE 02/03
<br />UNDERGROUND STORAGE TANK
<br />MONITORING PLAN — PAGE I
<br />TYPO OF ACTION ® I. NEW PLAN ❑ 2. CHANGE OF ;FOR'M,7IONW
<br />Mal,
<br />PLAN TYPE 0 MONITORING IS IDENTICAL. FOR ALI, USTs AT TLTIS FACILITY.
<br />Mai.,
<br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S):
<br />I. FACILITY INFORMATION
<br />FACILITY M # (AVney Uw Orly)
<br />BUSINESS NAME (Some as FACILITY NAME) California Fuel Supply 136144
<br />MR?'
<br />RUSINFSS.SIT'EADDRESS r2175 Country Club
<br />CITY Stockton
<br />'"°'
<br />IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE
<br />State law requires that tastinp, preventive maintenance and enlibmiion of monitoring equipmatt (e.g„ sensors, probes, line leak detectors, etc,) be performed at the frequency
<br />specified by the equipment manufacturers' In -tractions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel.
<br />MONTTORING EQUIPMENT IS SERVICED I. ANNUALLY Moa. ❑ 99. OTHER (Specie); Mar.
<br />III. MONITORING LOCATIONS
<br />This monitoring plan must include a Site Plan showing the general tank and piping layouts And the locations where monitoring is performed (i,e„ location ofeach sensor, line leak
<br />detector, monitoring system control panel, etc), Ifyou already have a diagram (e.g,, current UST Monitoring Silo Plan ftm a Monitoring System Certification farm, His7AMous,
<br />Materials Swim= Plan map, etc.) which shows all T2guircd information include it with this plan,
<br />IV. TANK MONITORING
<br />MONITORING 1S PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply)
<br />M14
<br />0 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULTS)
<br />SECONDARY CONTAINMrNT IS: D a. DRY ❑ b, LIQUID FI11M, Cl c. PRESSURIZED 0 d, VACUUM
<br />MII.
<br />PANEL MANUFAC'I'URt;R: Veeder Root � M12. MODEL #: iLuag
<br />Mt1
<br />LEAK SENSOR MANUFACTURER: Veeder Root Mtn' MODEL #(S):?4_d3W304
<br />MIs.
<br />0 2, AUTOMATIC TANK GAUGING (ATG) SYSTEM tISFD TO MONITOR $p jCc1 F,�ALL TANK(S3
<br />PANV. MANUFACTURER: MIR- MODEL q;
<br />M17.
<br />)N -TANK PROBEMANUFACTURF„R: MIR' MODEL#(S):
<br />M1*
<br />LEAK TEST FREQUENCY: 23 a. CONTINUOUS ❑ h, DAILY/NT014TL.YMar'
<br />❑ c. WEEKLY
<br />❑ d. MONTHLY ❑ a, OTHER (Specify):
<br />M21.
<br />PROGRAMMED TrSTS: ❑ a. 0.1 &p.h. 0 b, 0,2 E,p,h, ❑ c. OTHER (Specify);
<br />M22. Hexa
<br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANIJAI_ PER 23 CCR 02646 ❑ b. STATISTICAL PER 23 CCR §2646.1
<br />Mad,
<br />Q 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645
<br />TES'T'ING PFR10D; 0 a. 36 HOURS [] b. 60 HOURS
<br />M2s.
<br />❑ S. INTEGRITY TESTING PER 23 CCR 52643.1
<br />TEST FREQUENCY: ❑ e, ANNUALLY ❑ b. BIENN[ALLY E3 e, OTHER (Specify):
<br />MIG, Mal
<br />❑ 6.VISUAL MONITORING DONE: ❑ a. DAILY ® b. WEEKLY Xvmim nRnwystzm RD
<br />❑ 0. OTHER (Specify):
<br />Mat.
<br />V. PIPE MONITORING
<br />MONTTORING IS PERFORMED USING TFTE FOLLOWING METHODS) (Check all that apply)
<br />Mau.
<br />® 1 CONTINUOUS ELECTRONIC MONITORING OF PIPING SL]MP(SkTRT?NCTi(ES) AND OTHER SECONDARY CONTATNMENT
<br />SECONDARY CONTAINMENT IS: 0 a, DRY 0 b. LIQUID FILLED 0 C. PRESSURIZED ® d. VACUUM
<br />Mai.
<br />PANf'LMANUFACTURER; VeedtrRoot Mxz. MODEL#: _ TL&J501t _
<br />M"
<br />LEAK SENSOR MANLIFAM1RFR: Vecder Runt Mst. MODEL #(S): 744.3M20$_
<br />M"
<br />�
<br />WILL. A PIPING LEAK ALARM TRIOGER AUTOMATIC PUMP (i,c„ TURBINE) SHUTDOWN? ® a, M ❑ h. NO
<br />M1a,
<br />WILL. FAIT,UREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? IM a, YES ❑ b. NO
<br />MIT.
<br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS $,0 S,p,h. LEAK TESTS AND RESTRICTS OR SHUTS OFF PRODUCT FLOW
<br />WHEN A LEAK IS DETECTED
<br />MLLD MANUFACTURER(s): Mfg' MODEL (((S);
<br />410
<br />3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g,p,h, LEAK TESTS
<br />ELLD MANUFACTURER; _ Red Jacket Mee. MODEL #: FXV
<br />Mai.
<br />PROGRAMMED 1N LINE TESTING: ❑ a. MINIMUM MONTHLY 0.2 g,p,h, M b. MINIMUM ANNUAL 0.1 g.p.h,
<br />Mea
<br />WILL FLLD DETVCTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SNUTDOWN7 a, YES ❑ b. No
<br />Md}
<br />WILL F.LLD FAIl.URFIDISCONNECTION TRLOGFR AUTOMATIC POM P 8 HUTDDWN7 A. YES 0 b. NO
<br />Med
<br />0 4. INTEGRITY TESTING
<br />TEST FRFQUF,.NCY. ❑ a. ANNUALLY © b. EVERY 3 YEARS ❑ c. OTHER (Spec*)
<br />ass. Man.
<br />❑ S.VISUAL MONITORING DONE: Q a. DAILY ❑ b. WEEKLY* ❑ C. MIN, MONTHLY & EACH TIME $YSTEM OPSRATED•P
<br />M47.
<br />' Rc�afreAgeycye�pmwl •*Alkmae ffitenm0fA,gnfgrnatrWMWra=Q1VSene WfilalpipjT%WIyparH&C125aaI.�Ib11J)
<br />❑ 6, SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR 426366)(3)
<br />© 7. NO PRODUCT OR REMOTE FILL PIPING I$ CONNECTED TO THE UST(c)
<br />❑ 94. OTHER (Stieciry)
<br />lean
<br />hwfwreA (9/24114) • 1!4
<br />
|