My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 1:52:51 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2006-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L' CNV P PETR4&LEUM ENGINEERING, INC.A CALIFORNIA CORPORATION <br /> ISMSIN 0=bVLA MMZTMWWSN-900' <br /> mvpeng@att.net- PO Box 281 Folsom,CA 95763-0281.Phone(916)984.1537•Fax(916)984-1117• ellular(996)205-1537 CA#768938 <br /> "" <br /> February 12, 2010 U llECENED <br /> FEB 1 n 2010 <br /> San Joaquin County Environmental Health Department ENVIRONMENT HEALTH <br /> 600 E. Main St. PERMIT/SERVICES <br /> Stockton, CA 95202 <br /> Re: Country Club 76 <br /> Attn: Mr. Garrett Backus <br /> Mr. Backus: <br /> The piping penetration repairs at the Country Club 76 at 2575 Country Club in Stockton are proposed to be A O Smith <br /> penetration fittings. <br /> We will: <br /> • Drain the product line back to the tank <br /> • Cut and remove the concrete at the 91 octane piping(stp) sump <br /> • Remove the existing penetration <br /> • Install the new AO Smith fiberglass penetration fitting <br /> • Re-connect the primary product piping and test/inspect <br /> • Reconnect the secondary piping and test/inspect <br /> • Test and inspect the piping sump <br /> • At the vent transition sump we will perform the same as for the product penetration <br /> After concrete has been placed AffordaTest will perform the necessary precision tank and line testing as well as the full <br /> system pressure decay tests. <br /> Th yodg& <br /> u, <br /> Mark Vendeiro <br /> MVP Petroleum Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.