My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 4:20:12 PM
Creation date
6/3/2020 9:43:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System stem Certification Form Addendum for Vacuum/Pressure Interstitialfetors 2 4 ZW7 <br />I. Results of Vacuum/Pressure Monitoring Equipment Testing <br />This page should be used to document testing and servicing of vacuum and pressure interstitial sensors. A copy of this' <br />form must be included with the Monitoring System Certification Form, which must be provided to the tank system <br />owner/operator. The owner/operator must submit a copy of the Monitoring System Certification Form to the local <br />agency regulating UST systems within 30 days of test date. <br />I Manufacturer: VEEDER ROOT I Model: TLS 350 n System Type: ❑ Pressure; ® Vacuum I <br />Sensor ID <br />J. Comments: Country Club Circle K <br />ALL PASSED 1-23-2017 Functionality Passed - No Communication done - no test ports. <br />Page 4 of 4 <br />' If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the <br />sensor, vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br />UN -036A -1/1 www.unidocs.org Rev. 01/26/06 <br />Component(s) Monitored by this Sensor: 87 PRODUCT <br />S1 <br />Sensor Functionality Test Result: ®Pass; El Fail Interstitial Communication Test Result: ®Pass; <br />❑Fail <br />Component(s) Monitored by this Sensor: 87 TANK ANNULAR <br />S2 <br />Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; <br />❑ Fail <br />How was interstitial communication verified? <br />Component(s) Monitored by this Sensor: 91 PRODUCT <br />below <br />S3 <br />Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: 91 TANK ANNULAR <br />S4 <br />Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: DIESEL PRODUCT <br />S5 <br />Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: <br />Ranenr Fnnctinnnlity Test Resnit F-1 Pass' n Fail interstitial Communication Test Result: n Pass: <br />n Fail <br />J. Comments: Country Club Circle K <br />ALL PASSED 1-23-2017 Functionality Passed - No Communication done - no test ports. <br />Page 4 of 4 <br />' If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the <br />sensor, vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br />UN -036A -1/1 www.unidocs.org Rev. 01/26/06 <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br />How was interstitial communication verified? <br />❑ Leak Introduced at Far End of Interstitial Space;' ❑ Gauge; ® Visual Inspection; ❑ Other (Describe in Sec. J, <br />below <br />Was vacuum/pressure restored to operating levels in all interstitial spaces? ® Yes ❑ No (If no, describe in Sec. J, below) <br />J. Comments: Country Club Circle K <br />ALL PASSED 1-23-2017 Functionality Passed - No Communication done - no test ports. <br />Page 4 of 4 <br />' If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the <br />sensor, vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br />UN -036A -1/1 www.unidocs.org Rev. 01/26/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.