Laserfiche WebLink
v <br />5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? YES [ j <br />b. Identify contractor performing decontamination: <br />Name <br />Address <br />c. Describe method to be used for decontamination: <br />NO [] <br />Phone (� <br />City Zip <br />d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: /j/& <br />Hauler Name Phone Hauler Reg## <br />Address City <br />Permitted Disposal Site <br />6. a. Describe the method that will be utilized to purge and/or inert the piping: <br />Zip <br />b. Piping Hauler: ,) / <br />Name /�/ t Phone (_) <br />Address City Zip <br />Hauler Registration # (if hauled as hazardous) <br />c. Piping Disposal Site: <br />Name Phone <br />Address City Zip <br />EPA ID# (if transported to a permitted TSD facility) WA—YES <br />7. Is the sampling firm an independent third party from the contractor? [ ] NOa. Identify sampling firm: <br />Name Phone(_ <br />Address City Zip <br />b. Identify laboratory performing analysis: <br />Name Phone �) <br />Address City Zip <br />8. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained: <br />9. a. Handling of excavated soil (Contaminated Soil Hazardous Waste Hauler): <br />Name Hauler Registration # <br />Address City <br />b. If soil is not to be hauled, describe what will be done with it: <br />EH230038 (revised 12-11-15) 4 <br />N! <br />Phone �) <br />Zip <br />