Laserfiche WebLink
i <br />Remove & save the SVA -BARB from the <br />Gauge Assembly Schrader Valve <br />- Use test assembly and pressure sump to 4 PSI. <br />Close off with ball valve and resume other work. <br />Allow I Hour before recording pressure. <br />A 0 <br />IIIM�I <br />FIELD AIR INTEGRITY INSPECTION TEST <br />Hold pressure for a minimum of 1 hour for a <br />Field Integrity Inspection Test. After <br />t t11 <br />passing the pressure est, a sump <br />should immediately be filled with interstitial <br />monitoring fluid for the rest of the construction period. <br />Hold pressure for of i hourfor •Integrity Inspection <br />The Under Dispenser Containment Sump PASSES the integrity test if the Sump shows NO <br />signs of continuous pressure decay. IF TEST PASSES - CONTINUE ON TO THE HYDROSTAT - <br />outlined SECTION <br />ExtendedS. Bravo Systems Highly Recommend,"; <br />an pressure test. I <br />a: On factory -installed gauge, pressure sump Interstice to EXACTLY 4 PSI. <br />b: Close off interstice with ball valve and soap exterior of dispenser sump body, paying close attention to <br />penetration fittings, edges and comers. <br />e: Locate leak point(s) and mark with marker so you can locate it / monitor it. <br />c: Repair or reinstall penetration fittings according to your doublewall penetration fitting manufacturers' <br />Installation / Maintenance Instructions. <br />d: Occasionally... Bravo Fiberglass Series Products may suffer mild damage in transit or field installation. <br />Please take a close look at edges and comers. <br />f: Abrade a 2" diameter area centered on the leak point until flow coat is gone and natural resin/fiberglass <br />material can be seen. Dust with shop brush or compressed air and do not use shop towels or acetone. <br />S. Bravo Systems recommends "Smith Fibercast Adhesive Kit #8014" to repair and reinforce Bravo <br />Fiberglass products. Make sure area is completely dry and apply resin generously while pulling -2 PSI <br />vacuum to suck adhesive into pinhole leak for 1 minute. For anything larger than pinhole leaks you must <br />consult the factory. <br />g: Let cure for a minimum of 4 hours @ or above 75" Fahrenheit. <br />13.3 - IF ANY REPAIRS ARE MADE, After Cure., RepeatStepS 13.1 to 13—n <br />FOR 1 ' • j • •RING - PROCEED TO STEP 13.4. <br />FOR CONTINUOUS VACUUM MONITORING - The B8000 and 9000 Series Sump cannot exceed <br />16" of Mercury� Follow your vacuum system manufacturer's installationinstructions to install, <br />s monitor the doublewall system with vacuum. Continueon •, Step <br />E. <br />:8110 i•1! ■11 l7 <br />