My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 4:20:12 PM
Creation date
6/3/2020 9:43:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/02/2012 03:38 9252920074 GDF_SOLUTIONS* PAGE 02/15 <br />i <br />106. <br />Monitor reprogrammed by Central Petroleum. <br />201 <br />Fest results sent to you by Afford a Test and maintained on site. <br />202 <br />UST Response Plan attached to this response. <br />201 <br />Alarm List / response <br />L2-87STP <br />Added Brine due to construction, / boot replacement project, brine burp <br />L5-91 Sump <br />Removed rainwater from Sump. .5 gal removed and put in barrel on site. <br />L6-91 STP <br />Added Brine do to construction / boot replacement project brine burp <br />L891 Surap <br />Removed Rain water. Rain Water removed and place in barrel at station <br />L14 -Vent Sump <br />Add Brine due to new construction / boot replacement project. brine burp <br />L16 <br />Removed Rain water. Rain Water removed and place in barrel at station <br />L20 <br />Removed Rain water. Rain "Water removed and place in barrel at station <br />S1-87 Product Vac <br />No Vac, Check valve replaced by MVP. Veederoot could not recover full vac because of <br />check valve. <br />S2-87 Tank annular <br />No Vac, Check valve replaced by MVP. Veederoot could not recover full vac because of <br />cheek valve. <br />S-4 91 Tank annular <br />Replaced cord grip on 91 annular 2 inch riser. <br />DO will make sure to note all alarms on monthly inspection. <br />305-405 <br />Sensor replaced by central petroleum and re -tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.