Laserfiche WebLink
03/02/2012 03:38 9252920074 GDF_SOLUTIONS* PAGE 02/15 <br />i <br />106. <br />Monitor reprogrammed by Central Petroleum. <br />201 <br />Fest results sent to you by Afford a Test and maintained on site. <br />202 <br />UST Response Plan attached to this response. <br />201 <br />Alarm List / response <br />L2-87STP <br />Added Brine due to construction, / boot replacement project, brine burp <br />L5-91 Sump <br />Removed rainwater from Sump. .5 gal removed and put in barrel on site. <br />L6-91 STP <br />Added Brine do to construction / boot replacement project brine burp <br />L891 Surap <br />Removed Rain water. Rain Water removed and place in barrel at station <br />L14 -Vent Sump <br />Add Brine due to new construction / boot replacement project. brine burp <br />L16 <br />Removed Rain water. Rain Water removed and place in barrel at station <br />L20 <br />Removed Rain water. Rain "Water removed and place in barrel at station <br />S1-87 Product Vac <br />No Vac, Check valve replaced by MVP. Veederoot could not recover full vac because of <br />check valve. <br />S2-87 Tank annular <br />No Vac, Check valve replaced by MVP. Veederoot could not recover full vac because of <br />cheek valve. <br />S-4 91 Tank annular <br />Replaced cord grip on 91 annular 2 inch riser. <br />DO will make sure to note all alarms on monthly inspection. <br />305-405 <br />Sensor replaced by central petroleum and re -tested. <br />