My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_1986-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 9:32:19 AM
Creation date
6/3/2020 9:43:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2006
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_1986-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> Site Name: Address: <br /> 4. MMUOVERFIOLL CONTAINAffNT BOXIES <br /> Facility is Not Equipped With Spill/OverfiH Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested D <br /> Test Method Developed By: 0 Spill Bucket Manufacturer dustry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure C Vacuum hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: I Equipment Resolution: <br /> Spill Box# Sp,�l Box# � SQili Boa# <br /> 1Bu=ck!ataiameter. ` JO / „� l- 1 '�epth: - <br /> Wait time between applying <br /> pressure/vacuum/water and CIdle ✓ <br /> starting <br /> test: <br /> Test Start Time: �®'�y <br /> Initial Reading <br /> Test End Time: -3 � C 1 <br /> Final Reading(Rr): P <br /> Test Duration: P✓;/ «- ' 1'f� �'�� <br /> +Change in Reading(RF-RA): <br /> Pass/Fail Threshold or <br /> Criteria: f' /' <br /> Test Result 0 PM 0 Fail 0 Pass 0 hail dPass 0 Fail Apm ❑Fail <br /> Comments—(include a#armanon on repairs made prior to testing, and recommenced follow-up for faded tests) <br /> y <br /> f.z <br /> / P <br /> 6 Gd •G� f <br /> Technician Name: <br /> Q <br /> Sip-nature: / <br /> Test Date: t '� <br />
The URL can be used to link to this page
Your browser does not support the video tag.