Laserfiche WebLink
SWRCB,January 2002 Page Z3 ofd <br /> �® 5. SECONDARY PIPE TESTIN <br /> Test Method Developed By: ❑Piping Manufacturer ustry Standard ❑Professional Engineer <br /> , 0 Other(Spec) <br /> Test Method Used: allressure 0 Vacuum ❑Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: „f 2 t" Equipment Resolution: <br /> q. .- "• U r� res, r �. � � .uar,;usmw. .. ? Ue & �t4�ate: <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: V) g+ <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: 17ews <br /> Method and location of <br /> piping-run isolation: cark7 e 0 6e a&4C) <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: Z <br /> Change in Reading(RF=R1): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Apass 0 Fail Pass ❑Fait ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up_for failed tests) <br />