Laserfiche WebLink
t F. Yn-Tank. Gauging/SER Apment. Check this box if gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed- <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete thewin checklist: <br /> ❑ Yes ❑ No* Has wiring been inspected for propern,znc ti ' Q testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging ected for damage and residue buildup? <br /> D Yes Cl Was accuracy of sO=rVr61=leve tested? <br /> U ❑ No* Wf system water level readings tested? <br /> ❑ ere ail probes reinstalled properly?. <br /> ❑ No* � Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section 13, below,descn-be how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): Q�Check this box if LLDs arc not installed. <br /> Co the following checklist: <br /> ❑ Yes ❑ 7NT /A <br /> equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ (Chep a ply) Simulated Ieak rate: ❑3 g-p.h.; ❑0.1 g-p.h; Cl 0.2 g_p-h- <br /> ❑ Yes ❑ No* Were all LLDs confirmed opera d accurate within regulatory requir <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product i a Teak? <br /> Q N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turb• somatically shut off if the LLD detects a <br /> C) N/A <br /> ❑ Yes Q No* For electronic L , oes the turbine automatically shut off if any portion of the monitoring sys ' disabled <br /> ❑ N/A or disconu ? <br /> ❑ Yes Q No* F ectronic IJ-Ds,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ or fails a test? <br /> ❑ Yeg, No* For electronic LLDs,have all accessible wising connections been visually inspected? <br /> ❑ N/A <br /> Q Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *in the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments` <br /> Page 3 of 3 03101 <br />