Laserfiche WebLink
F. In-Tank Gauging I SIR Equipment- El Pdeck this box if tank gauging is used only for inventory control. <br /> I IV Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Coen fete the follo , g checklist: <br /> 0 Yes Q No* Has all input wiring been inspected for PrOW entry and termination,including testing for ground faults? <br /> Zl Yes Q No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes L] No* Was accuracy of system product level readings tested? <br /> 0 Yes U No* Was accuracy of system water level readings tested? <br /> El Yes Q Na* Were all probes reinstalled properly? <br /> El Yes 0 No* Were all item on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section K below,describe how and'when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): VCheck this box if LLDs are not installed. <br /> COMMfete the folio * checklist: <br /> 0 Yes 0 No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> C] N/A (Check all that apply) Simulated leak rate: U 3 gpAL; Q 0.1 g.p.h; 0 0.2 g.ph. <br /> Q Yes U No* Were alLLJ_Ds confirmed operational and accurate within regulatory requirements? <br /> Q Yes Q No* Was the testing apparatus properly calibrated? <br /> ❑ Yes Q No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak. <br /> Q"NIA <br /> 0 Yes Q No* Fol electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> El N/A <br /> ❑ Yes Q No* For electronic LLDs,does the turintte automatically shut off if any portion of the monitoring system is disabled <br /> El N/A or disconnected? <br /> 0 Yes E] No* For electronic LLDs,does the turbine automatically shut off if any pardon of the monitoring system malfunctions <br /> EJ N/A or fads a test? <br /> 0 <br /> Yes El No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> CO3 Yes El No* Were all items on the equipment manufaca='s maintenance checklist completed? <br /> *In the Section F1,below,describe how and when these deficiencies were or will be corrected. <br /> H. COMBWnts: <br /> Page 3 of 3 03/01 <br />