My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_1986-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 9:32:19 AM
Creation date
6/3/2020 9:43:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2006
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_1986-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONTI TORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-:3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> r ) <br /> Facility Name /~ .f / <br /> Facility Address '725- 9K flqik l , C4 � 31 .�° <br /> A. Describe the fre u9ncy of perfo g the mo 'to ' g: <br /> Tank l 4 JAI) t� � ) 1TJ <br /> 9 <br /> Piping 6-in - <br /> B. What methods and equipment, identified by name and model, will be used for <br /> perforrin g the monitorin . <br /> Tank J1$ I�J" tz k0 . <br /> Piping6 ` ® eQliafP1,v <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> shoul d be attach d): <br /> d ' C <br /> D. List the name(s) and title(s) or the people responsible for performing the monitoring <br /> and/or maintaining the equi mens: <br /> E. Reportin format.for monitoring- <br /> 'I <br /> onitoring: P <br /> Tank /'t� ✓ d <br /> Piping ® via <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufla rsm 'ntenance schedule <br /> but less Xhan every,12 months: <br /> iv <br /> C D <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the morutori�g equ'pment: �- <br />
The URL can be used to link to this page
Your browser does not support the video tag.