My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_1986-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 9:32:19 AM
Creation date
6/3/2020 9:43:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2006
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_1986-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 06 03 11:31a RL TAR/WESTSTAR (55 77-0106 p.3 <br />MAY -06-2003 TUE 03;02 PM E PT FAX N0, 800 4W329 P. 03 <br />Name of ATGS g@W AUT® STINGII and AUTO A11K JIB. <br />Version <br />Uraltations, on the Results <br />- -= < <br />• The metlod has not been substantially changed. <br />• The vendoes instructions for installing and operating the ATGS are followed. <br />• The tank contains a product identified on the method description form. <br />• The tank is no larger than 1 gallons. <br />• The tank is at least SQ percent full. <br />• The waiting time after adding any substantial amount of product to the tank Is 6 hours. <br />• The temperature of the added product does not differ more than ti. degrees <br />Fahrenheit from that already in the tank. <br />• The total data collection time for the test is at least 4 _ hours. <br />• Other limitations specified by the vendor or determined during testing: <br />> Safety disclaimer: This test procedure only addresses the issue of the ATG systerWa, <br />ability to detect leaks. It doss not tam the equipment for safety hazards. <br />Certification of RssuRs <br />(X) standard EPA test procedure for ATGS <br />() altemabve EPA test procedure for ATGS <br />,en Wilcox �,ssocia op, Inc. <br />perfotming evaluation) <br />x s: <br />ATGS - Results Form Pap 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.