Laserfiche WebLink
AML <br />STAR <br />RONMENTAL INC. <br />4688 W. Jennifer, Suite 101, Fresno, CA 93722 <br />License No. 605142 <br />March i 2003 <br />San Joaquin County <br />Environmental Health <br />Attn: Dina Abate <br />304 E. Weber Ave <br />Stockton, CA. 95202 <br />Dina, <br />We are re -submitting at your request, this description of work to be completed at Lodi Memorial <br />Hospital located at 975 South Fairmont, Lodi, CA 95340. If you need anything please call, or fax <br />either myself or Dave Mendrin as soon as possible. Our customer is trying to expedite permit <br />approval. <br />Thank you <br />Denise Mechekoff <br />PHASE I - UST REMOVAL <br />1. Saw cut, excavate and remove (1) 10'x 24' x 2" asphalt/6" concrete over tank <br />2. If required by County officials soil samples will be obtained. <br />PHASE II <br />1. Plumbing: Expose existing piping sump and expose existing suction/return product lines at <br />building. Bore through concrete wall and install 3" Environ Flex pipe through wall. Install 1" <br />APT doublewall piping through 4" Environ Flex pipe conduit. Make necessary connections to <br />tank and generator facility. Provide necessary repairs to existing piping sump. NOTE: Product <br />lines will be double wall 1" APT piping system sleeved inside 4" Environ Flex piping from piping <br />sumps to generator area, which will only be used as a chase conduit. Vent lines are existing <br />single wall Fiberglass system. <br />2. Provide electrical conduits and power for (1) annular tank sensor, (1) piping sump sensor, and <br />(1) inventory probe. NOTE: Contractor to tie into existing electrical panel and breakers. After <br />inspections, backfill and compact over tanks and trenches to subgrade. <br />3. Concrete .work consisting of: <br />(1) 8'x 22'x 6" tank pad NOTE: All concrete will be 5 sack mix with #4 rebar 24" O.C. <br />4. Patch remainder of disturbed areas with 2" A.C. Hot asphalt 64 sq. ft. maximum). <br />5. Install all equipment, start system and check for correct operations. Purge product lines, <br />precision test suction return lines per Environmental Health requirement. Provide pre -training <br />and start-up instructions to company personnel (2 hours equipment training). <br />6. Contractor to furnish temporary suction and return fuel lines from UST to generator facility. <br />Lines to be connected each day before contractor leaves site or if generator start during <br />construction. <br />